PASTE meeting

→ Europe/Zurich
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0122882 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0122882
Production and PASTE Meeting, 3rd July 2007, CERN Chair: P.Charpentier Minutes: S. Paterson CERN: M.Bargiotti, G.Castellani, P.Charpentier, J.Closier, U.Marconi, S.Paterson, R.Santinelli Phone: R.Bernet, R.Graciani, M.A.S.Miguelez, R.Nandakumar Apologies: N.Brook, A.Tsaregorodtsev, A.Smith 1. Production Status Report Minutes from the production meeting are available here. All signal simulation jobs have been submitted and are waiting in the queues. A 3.8K maximum number of concurrent jobs was reached but this is still far from optimal. Joel reported that the SAM test suite was rerun on all CEs and now ~60 are OK. There are still many permissions and mappings problems. For the reconstruction, all jobs are submitted and some are running jobs remain for GridKa and CERN. Joel mentioned that no jobs had been scheduled to GridKa recently and he is awaiting a response from the site admins. All stripping jobs in the processing DB have been submitted and are running everywhere except GridKa. Many are failing in the DaVinci step and this should be investigated ( ACTION: Joel ) Philippe conveyed that the sum of jobs obtained from the Bookkeeping is not consistent with expected numbers. There is already some discussion of this on the mailing lists and Philippe will continue to investigate. ( ACTION: Philippe ) Many jobs appeared to fail simultaneously at RAL and it was suggested that either SRM configuration or NFS access was the culprit. Subsequently it was found that the software installation area had been corrupted due to incorrect VOMS mappings of Raja's credential. The recent fixes to the DIRAC software distribution mechanism resolve this situation (v2r15p1). 2. Production Operations Issues Roberto reported that the creation of spurious '.lhcb' directories in site shared areas was due to incorrect VOMS mappings of Raja's credential. The proposed solution from Joel and Stuart to the software distribution problems have now been deployed in production. This prevents any user from writing to the shared area, regardless of their VOMS mapping. The full software will be installed local to the jobs in the case that it is not found in the shared area. In Joel's absence it was agreed that Stuart would take over the SAM software installation. Joel agreed to provide some documentation for this and to rerun the tests at all sites before his vacation. ( ACTION: Joel, Stuart ) Philippe raised the issue of Castor mapping users to lcgprod in preference to other groups. For pool accounts there must be a group associated to this or lhcbprod files would not be readable by the lhcb group. It was suggested that a task force meeting with Tier-1 site representatives be arranged to discuss this issue. ( ACTION: Philippe ) Raja had problems generating a VOMS proxy of the correct size. As a result Stuart reported that we are now using a Grid proxy in production. Roberto mentioned that the 1 month VOMS extension request has been refused and it was unclear whether the gLite RB would renew credentials pending in site batch queues. Roberto agreed to investigate. ( ACTION: Roberto ) Two bugs were introduced to the pilot script affecting matchmaking of jobs and submission of generic pilot agents to the production system, a partial fix was introduced by Stuart during the DIRAC3 week. Gianluca agreed to resolve the use of glite-brokerinfo, where deployed. ( ACTION: Gianluca ) Several sites are deploying SLC4, since 32 bit compatibility is assured at eligible sites, LHCb will use it in this way for now. For the future, the platform can be declared via the CMTCONFIG variable such that LHCb software tags can be specified. Ricardo asked whether there was a convention for particular CEs to have 32/64 bit worker nodes and it was confirmed that a homogeneous policy is recommended but not enforced. Philippe mentioned that LHCb can take responsibility for publishing our software tags to reflect the WN architecture. The current plan is to make use of SLC4 native by August. 3. DIRAC3 Tasks A template should be designed and circulated for the CHEP posters and talks. Philippe agreed to send a mail to the developers list outlining a schedule of work. ( ACTION: Philippe ) Ricardo reported on the progress made during the DIRAC3 week, there were several discussions about the website and developers were helped to set up DIRAC3 on their own machines. An important bug fix was made to the DISET framework that was causing services to hang. 4. AOB Nick agreed to chair the Operations meetings over the next 2 weeks while Joel is on vacation. Raja mentioned that the RAL Castor LHCb instance is being deployed. There are 4/5 pools available and Raja was asked to contact Nick about setting up the service classes relevant for LHCb. Umberto reported that there is likely to be several months delay for the pledged resources due to the cooling infrastructure not being in place. After a meeting with CNAF responsibles there is a possibility that the volume currently used for STORM testing (~36TB) could be made available to LHCb.
There are minutes attached to this event. Show them.
    • 10:00 → 10:15
      Production status report 15m
      - Report from the Production meeting:
    • 10:15 → 10:45
      Production operations issues 30m
      - Pilot script for both LCG and gLite sites status - DIRAC v2r15p1 status
    • 11:05 → 11:35
      DIRAC3 tasks 30m
      Summary of the developer session last week
    • 11:35 → 11:45
      AOB 10m