RILIS integration RP

Europe/Zurich
508/1-001 (CERN)

508/1-001

CERN

20
Show room on map
  • Monitors:
    • Monitor 1: Next to BI rack on GLM shielding wall
      • This monitor is flexible in the position
      • Vincent can propose a spot to RP that works best for integration
    • Monitor 2: Next to HRS door
      • Proposed spot is close to where it originally was
      • Next to new electrical rack on the wall
      • This should keep the line of site required for the tape station
      • One suggestion from Elodie is to maybe have a long cable for this probe and have the option to be able to move it closer to the beamline on a temporary stand
    • Monitor 3: On the roof, attached to shielding where old laser roof access ladder was
      • This monitor is no longer useful here
      • Useful to keep monitoring the activated water that goes around the shielding on the opposite wall
      • RP to propose a location on the opposite wall
    • Monitor 4: Inside lab
      • RP to propose a location
      • Initial suggestion is they would like it similarly placed to how it was before in the center of the wall by EBIS
    • Monitor 5: New portable monitor
      • This will have the ability to roam the lab
      • Just require one place for an outlet and a long enough cable to move it around
  • Open ventilation portholes to HRS where pipes run through
    • RP to confirm if these now need to be fenced off since with the new platform this will now be at head height

 

Next steps:

  • RP to take some screenshots and propose some locations then Vincent will check with integration if the locations fit
  • If longer cables are required due to monitors being moved around, this will be up to the RP team to follow up on this