Lanxin Ma
June. 2007
Major work for ; major changes in workplan
----------------------------------------------------------------
1. start working on EUChinaGrid infrastructure & application evolution
2. Pushed chinese admin of euchina SAM to upgrade SAM clients, and gave help
on solving the problem for EUChina vo during the upgrade
3. Process EUChina tickets
4. infrastructure trubelshooting:investicate & solve EUChina sites problem
IHEP UI problem
SE in GR-01-AUTH
5. Continue working on CMS SW installation in EUChinaGrid sites
- in order to test whether the CMS SW installation scripts work properly,
ran the script interactively in euchina ui.
The result is that the scripts works properly and CMS SW is installed sucessfully and locally
- Test CMS SW locally in order to know whether CMS SW installed by the scripts work properly
The result is that CMS SW application installed by the scripts works fine
- After testing the scripts locally, launched jobs and installed sucessfully CMS SW application
in INFN-CNAF site remotely by jobs. The CE is gridit-ce-001.cnaf.infn.it.
- CMS SW appliaction in INFN-CNAF installed remotely by job is tested. it works. And it is published
correctly at cms webpage.
http://cmsdoc.cern.ch/cms/ccs/wm/www/Crab/cmsCE.html
- Also tested CMS SW application in INFN-ROMA3, GR-01-AUTH, INFN-CATANIA using euchina UI & RB and CERN UI & RB
- Encountered and fixed problems during installing and testing(it will be in my report).
- I am writing CMS SW application installion and test report.
- Made CMS SW deployment status form which describe the CMS SW application deployment status in each
EUChina site. The form is being filled.
6. EUChinaGrid website usability survey.
Major work for ; major changes in workplan
---------------------------------------------------------------
1. VOMRS maintenance & troubleshooting in LCG production server
2. VOMRS user support, Process user's requests, problems & tickets
3. open a vomrs bug in savannah
https://savannah.cern.ch/bugs/?26925
4. Added VOMRS FAQ at
http://goc.grid.sinica.edu.tw/gocwiki/VOMRS_FAQ
5. Start working on establishing BDII, WMS, UI& SAM client chain
6. PPS top level BDII maintance & PPS_upgrade 31,32,33
Major issues arising
--------------------
Major events attended (include links to event/presentation)
---------------------
IT-GD-OPS weekly meeting
Plans to attend/organize major events (intra-EGEE and others)
-------------------------------------------------------------
Holidays during the period
------------------------------------------------------------
0 days
TimeSheet for the month
------------------------------------------------------------
WP3/A3.3 50%
wp4/A4.1 50%
Infrastructure status
------------------------------------------------------------
10 of sites in project
10 of sites contributing to the EGEE production infrastructure
1332 of total cpus
total SE: 10
total CE: 10
total RB: 7
total FTS: 0
total LFC: 1
total Local LFC: 1
total GridICE: 10
************************************************************