Meeting this morning with CERN https://indico.cern.ch/event/1727421/
RADES
CMS GEM
Neutrino Platform
GIF++ :
Piping work in progress
added 2 ODH detectors.
AMBER :
Nothing special to be reported except of an issue with our winter chiller system which is followed up by Fred from EN/CV with an maintenance of the system.
CLOUD
On-site installation work ongoing in view of CLOUD19 run start on Monday 19 October.
Reception of instruments. These occupy space in the entrance area next to CLOUD.
Installation of the instruments to the CLOUD zone.
CLOUD19 Instruments/gases/chemicals ISD and Safety Panel, EDMS: 3479627
Safety inspections scheduled for 12 and 16 October.
ELENA/GBAR
ISOLDE/PUMA
NA61/SHINE (self-added)
The air in barracks got very warm after turning off chilled water circuits (28-30 deg C). Ventilation units still working. Asked EN-CV for intervention. Frederic Juban turned off the ventilation units. Temperature dropped to 21-25 deg C except for the room 887/1-A52 where it is still at 27-28. Not a big problem for us now.
The same thing happened to our MTPC hut (887/R-F60 + 887/1-D58). Here it is more critical as we have there fragile electronics. Together with EN-CV we turned on our old chiller located just next to 887/R-F60. Temperature being maintained now at 21-22 deg C.
We turned back on monitoring of atmospheric conditions in our rooms in EHN1.