    • 14:00 → 14:05
      General news - Review of minutes 5m
      Speakers: Erwin Siesling (CERN), Hanne Heylen (CERN), Joachim Vollaire (CERN)
    • 14:05 → 14:15
      Safety matters 10m
      Speakers: Andreas Herty (CERN), Hanne Heylen (CERN), James Devine (CERN), Joachim Vollaire (CERN)
    • 14:15 → 14:20
      IBDRS project update - Work in the primary areas - BTY line @ 2 GeV 5m
      Speakers: Ana-Paula Bernardes (CERN), Joachim Vollaire (CERN), Melania Averna (CERN)

      BTY.BVT101 is at the surface (message from M. Albert). PSB side actitivty. Civil engineering work ongoing. 

    • 14:20 → 14:25
      RILIS Laboratory upgrade project - Exhaust gas line re-routing - activities update 5m
      Speakers: Carlotta Porzio (CERN), Katerina Chrysalidis (CERN), Laura Lambert (CERN), Sebastian Rothe (CERN)
      • Planning in the hall for Friday 6th? Is it possible to use the crane to bring in some pipes for HRS vac pipe rerouting?
      • Shielding installation
        • Shoring of HRS entry this friday 6th
        • Installation of shielding in back wall of RILIS next week
        • Shoring to be removed tentatively next fri 13th
      • Back pillar being removed and modified today
        • Roof I-beam also to be temporarily removed to allow for forklift to fit in with the crane
    • 14:45 → 14:55
      Mechanical Workshop and other support requests 10m
      Speaker: Oscar Fjeld (CERN)

      Completed work:

      •  VITO/DNP (193) - modified a stainless-steel tube and machined a groove in a laser-cut component.

       

      • VITO/DNP (192) - drilled through two Teflon rods, retaining the greatest practical length.

       

      • ASCII/GLM (189) - made a new cable opening in an acrylic sheet.
      • GLM (188) - cut a PVC pipe and made an opening in a perforated sheet
      • GPS/HRS (180) - drilled mounting holes for an exhaust bracket on each side of the wall.

      • Test mount demount valve and pump frontend offline 2

       

       

      Development and follow-up:

      • Building 170 ISOLDE sign (88) - ordered.

       

      New requests:

      • Miniball (190) - design, manufacture and install supports for the new preamplifier boxes.
      • Miniball (191) - refurbish the beamdump rack: dismantle the existing vacuum controls and fit new rails and Perspex panels.

       

    • 14:55 → 15:00
      Planned visits and AOBs 5m
      Speaker: Hanne Heylen (CERN)
      • Request from Guilherme:
        • Painted reference lines on the floor - defined by theodolite team - for alignment of experiments, defining beam axis at the center of the beamline
        • As long as possible (several meters) to cope with the diff sizes and mounting setups
        • Proposal to have them at GLM, LA1, LA2, and some others TBD