PTB meeting 06/03/2012 10:10 - 11:54, on skype
Present: Jon, Balazs, Laurence, Marco, Cristina
not needed: Patrick and John
i) The meeting had the goal to define high level objectives from the newly received requirements for Compute, Infrastructure and "SA1" area.
Compute requirements one by one:
--------------------------------
#26610 CE should "secure" jobs with special memory requirements
new objective: "Ability to process job with different characteristics in a suitable environment"
#20329 High Availability (HA) CREAM
already captured in X16 "Evolve components"
#20345 Increase of LB WS interface performance
The requirement was decided to be cancelled (returned)
#26408 Support for three additional JDL attributes: SMPGranularity, HostNumber,Wwholenodes
it was marked as a duplicate of the more general 26602
#26580 WMS to support multiple Top-BDIIs
requirement got rejected/returned
#26602 CE should support jobs requiring whole nodes or multiple cores
new objective:
"C Provide better support for jobs requiring exclusive node and/or multiple core allocation"
#26614 CE interface extension for "job streams"
new objective: "EMI-ES interface extension for job streams"
#26577 Accounting of parallel jobs
to be treated as part of the C2 "CAR objective"
THEN, on the request of Marco PTB added two last minute requirements:
-enable logging from CEs to LB
-Reduce WMS memory usage
both of these are covered by existing objectives.
Infra requirements one by one:
------------------------------
#26575 Support for local jobs in the accounting system
Will be investigated how this request will fit with the CAR. To be covered by the existing C2 objective.
#26584 The accounting layer should treat sites with more than one CE installed correctly
new objective: "I Investigate the potential accounting problems due to co-deployment of multiple CEs at the same site"
list of the proposed new objectives, the outcome of the meeting:
-----------------------------------
- " C Ability to process job with different characteristics in a suitable environment"
- "C Provide better support for jobs requiring exclusive node and/or multiple core allocation"
- "C EMI-ES interface extension for job streams"
- "I Investigate the potential accounting problems due to co-deployment of multiple CEs at the same site"
aob)
next meeting will be on 8th March and the topic is Data and Security.
There is a problem: The morning time slot is taken by a JRA1 meeting. We need to run the meeting in the afternoon.