Failure studies at CLIC main Linac and Beam Delivery System

6 Jun 2012, 17:20
30m
30/7-018 - Kjell Johnsen Auditorium (CERN)

30/7-018 - Kjell Johnsen Auditorium

CERN

PLEASE NOTE: Wed 6th and Fri 8th June: 30/7-018 Thurs 7th June: 31/3-004
190
Show room on map

Speaker

Carlos Omar Maidana

Description

The CERN TE-MPE group has the mission to develop and maintain the systems to protect machine components from damage caused by ill controlled conditions. Various failure scenarios were studied and the potential damage these failures could cause to the machine structures was estimated. First results of the beam response to kick induced failures in the main LINAC and in the beam delivery system (BDS) sections are presented together with possible collimator damage scenarios.

Presentation materials