PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0122882 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0122882
Production and PASTE Meeting, 27th November 2007, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, A.Casajus, P.Charpentier, J.Closier, E.Lanciotti, S.Paterson, R.Santinelli Phone: R.Bernet, N.Brook, G.Kuznetszov, M.A.S.Miguelez, R.Nandakumar, A.C.Smith, A.Tsaregorodtsev Apologies: G.Castellani 0. Ongoing Action List 23/10/07 - Marianne - Request for basic documentation for restarting the Bookkeeping services 23/10/07 - Marianne - Bookkeeping should be migrated from SLC3 -> SLC4 and installed on volhcb05 30/10/07 - Marianne - Check number of events for prod 1957 in BK against LFC 30/10/07 - Marianne - Update of LFC replica flags (C checked, N checked but not present) 06/11/07 - Gianluca, Marianne - Remedy the Exceeded Max Staging Retry jobs and update ProcDB as required 06/11/07 - Gianluca, Marianne - Agents for automatic resolution of IntegrityDB entries should be developed 13/11/07 - Roberto - Contact ATLAS representative to understand VOMS usage in other VOs 13/11/07 - Alexei - Investigate recent sporadic failures at GridKa for production jobs 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions 27/11/07 - Roberto - Redesign LFC intervention plan for upgrade to latest version 27/11/07 - Andrei - Prepare draft pilot document as internal LHCb note 27/11/07 - Marianne - Investigate discrepancy of events for productions 1960 and 1962 27/11/07 - Elisa, Marianne - Prototype bookkeeping with API wrapped in DISET service 27/11/07 - Andrew - Make proposal for CS SRM2 SE definitions 27/11/07 - DIRAC developers - DIRAC3 (ongoing) Completed Actions Done - 06/11/07 - Raja - Install v2r17p2 on VO-boxes Done - 13/11/07 - Andrei - Preparation of the pilot agent framework document Done - 23/10/07 - Ricardo (Andrei) - Update Cleaning Agent to prevent user WMS problems Done - 13/11/07 - Joel - Check dump from Marianne and update ProcessingDB Done - 13/11/07 - Alexei - Produce dump of file namespace at GridKa for Marianne to proceed with LFC replica flags there Done - 13/11/07 - Roberto - Contact site administrators for Tier-1s and install latest version of LFC with Oracle streams enabled Done - 13/11/07 - Roberto - Check status of LFC admin interfaces with WMS instances as trusted hosts Done - 13/11/07 - Roberto, Gianluca - Resolve issue with Raja's credential causing failed pilot submissions Done - 13/11/07 - Joel - To check whether ancestor files are required for reconstruction production 1981 Done - 13/11/07 - Roberto - To check the LCG Utilities status for SRM2 at the Tier-1s Done - 13/11/07 - Joel, Matvey - lhcb-proxy-init should be committed and added to the LHCb startup scripts Done - 13/11/07 - Joel - To update VO ID Card to remove obsoleted group definitions 1. Production Status Report Minutes from the production meeting are available here. Joel reported that all requests have been submitted but a problem with the Bookkeeping prevented the production managers from checking the status. Marianne commented that after a restart of AMGA the server was stuck. Productions 1960 and 1962 seem to have a discrepancy, Marianne agreed to investigate. ( ACTION: Marianne ) The stripping workflows are now using the correct Brunel version. Test jobs to CNAF had failed with the account mapping and shared area usage. SARA was in scheduled downtime and as a result NIKHEF is still banned. CERN and PIC were running jobs smoothly. IN2P3 has recently been experiencing problems and will be in downtime until this afternoon. Jobs are pending for RAL and a mixture of results have been observed at GridKa. As part of the RAL migration, transfers have started and Marianne is starting to submit the jobs. There was some discussions over problems transferring certain files. Inconsistencies between LFC and SE are being observed for the DIGI files. This activity is ongoing. ( ACTION: Marianne ) 2. Production Operations Issues - Bookkeeping interface update Elisa is developing a python client based on the AMGA python API to replace the web page java scripts. Philippe reminded that the BK working group indicated that the web page would be kept for accounting information and not primarily for users. It was agreed to build a DISET service based on Elisa's module that could be extended initially to a CLI and could eventually be used to interface to the DIRAC3 web page framework. ( ACTION: Elisa ) Marianne will investigate the BK Manager that currently depends on javascript, this should be extended to DISET. ( ACTION: Marianne ) In order to prototype a test machine should be setup. Andrei suggested using volhcb01 after the migration of user and BK systems. - PIC migration Marianne has started to initiate the migration and has contacted the LFC support. Adri reported that everything should be ready to start the NStore migration at PIC side by the end of the week. The timescale for SRM2 migration is less clear but Adri confirmed this should occur by the end of the year (or early next year). - SRM2 Testing Andrew reported a summary of the SRM storage workshop. When recalling files from tape, dCache doesn't know where to put the file. It appears that a space token must be supplied now for both dCache and Castor whenever recalling from tape. Issuing 'gets' on disk, dCache will ignore the space token but Castor does require it. The best policy for our usage in the future would be to always supply a space token regardless of whether the backend storage uses it. Philippe will raise the issue at the MB. ( ACTION: Philippe ) Therefore, it was agreed that the space management must now be included in DIRAC. Andrew reported that the space token can be stored in the LFC as a metadata entry if required and separate logical SEs for each space token will have to be defined in the CS. Andrew agreed to circulate a mail highlighting recent discussions with Flavia on SRM2 and make a proposal for how to handle this in the CS. ( ACTION: Andrew ) The issue of testing SRM2 for TURL resolution on the WNs and reading by the applications will be postponed until next week. The developers will make every effort to ensure DIRAC3 can be used for this. ( ACTION: Stuart, Joel ) - VOMS proxies, sgm and production accounts, LFC admin interface v2r18 is now released in production and this deals consistently with VOMS proxies everywhere. Roberto will update the intervention plan for the migration to the new LFC service. ( ACTION: Roberto ) During the migration, the CNAF instance will be used as a RO instance and the CERN master and RO instances shall be upgraded. Then the CNAF LFC will be removed from the allowed list. Any problems with widespread use of VOMS credentials for the production managers, such as accessing LFC for writing, can be identified by Raja while monitoring the VO-boxes. ( ACTION: Raja ) There was some discussion on the use of static sgm accounts versus pool accounts. In summary, we have no preference as long as the implementation works. - volhcb05 migration, BK and user system Andrei wondered whether the port-scan had been performed and Joel confirmed this was the case. The migration to volhcb05 can proceed. In order to avoid migrating 10s of GB of sandboxes it was suggested to schedule the draining of the system from Friday midday. Outputs are expected to be retrieved by Monday midday and Monday afternoon the migration can proceed. For the BK services, Marianne has installed the services on volhcb05 but there are problems with LFC access, this should be certified before migration occurs, ongoing action. 3. DIRAC3 - Workload Management status (job submission, optimizers, monitoring) Stuart reported that the CE classes are in place. Work is proceeding with the Job Agent. - Release tools Installation and setup scripts have been prototyped by Joel. - Production Management status In parallel the development of production job submissions can continue. - Service Monitoring Adri reported that the DIRAC3 services are being updated after a recent pyOpenSSL upgrade. A service monitoring framework is under development. - Data Management Status TransferDB with Agent to submit and monitor FTS jobs in place. Strategies are being compared for replication. 4. AOB Andrew raised the issue of BK migration and wondered whether there was a plan for upgrading this to DIRAC3 eventually. It was agreed this should be first done in DIRAC2 before performing the simple upgrade to DIRAC3.
There are minutes attached to this event. Show them.
    • 09:30 → 09:40
      Ongoing actions 10m
    • 09:40 → 09:55
      Production status report 15m
      - Report from the Production meeting - Running applications at GridKa
    • 09:55 → 10:10
      BK interface update 15m
      Speaker: Elisa Lanciotti
    • 10:10 → 10:40
      Production operations issues 30m
      - RAL migration - PIC migration - SRM2 testing - VOMS proxies, sgm and production accounts, LFC admin interface - volhcb05 migration: BK, user system
    • 10:40 → 11:10
      DIRAC3 tasks 30m
    • 11:10 → 11:20
      AOB 10m