PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0122882 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0122882
Production and PASTE Meeting, 4th December 2007, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, G.Castellani, J.Closier, E.Lanciotti, S.Paterson, R.Santinelli, A.C.Smith, Phone: R.Bernet, G.Kuznetszov, U.Marconi, M.A.S.Miguelez, M.Sapunov, A.Tsaregorodtsev Apologies: N.Brook, P.Charpentier, R.Nandakumar 0. Ongoing Action List 30/10/07 - Marianne - Check number of events for prod 1957 in BK against LFC 30/10/07 - Marianne - Update of LFC replica flags (C checked, N checked but not present) 06/11/07 - Gianluca, Marianne - Remedy the Exceeded Max Staging Retry jobs and update ProcDB as required 06/11/07 - Gianluca, Marianne - Agents for automatic resolution of IntegrityDB entries should be developed 13/11/07 - Roberto - Contact ATLAS representative to understand VOMS usage in other VOs 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions 27/11/07 - Roberto - Redesign LFC intervention plan for upgrade to latest version 27/11/07 - Andrei - Prepare draft pilot document as internal LHCb note 27/11/07 - Marianne - Investigate discrepancy of events for productions 1960 and 1962 27/11/07 - Elisa, Marianne - Prototype bookkeeping with API wrapped in DISET service 04/12/07 - Marianne, Andrei - Bookkeeping should be updated to runit instead of init.d startup scripts 04/12/07 - Alexei, Andrei - Further investigate cause of sporadic failures at GridKa for production jobs 04/12/07 - Gianluca, Roberto - Prepare an SRM sensor test for the LHCb SAM framework 04/12/07 - Gianluca - Report problematic CERN tapes to the Castor support team 04/12/07 - Joel, Andrei, Andrew - Report on upgrade / retirement of older LHCb machines 04/12/07 - DIRAC developers - DIRAC3 (ongoing) Completed Actions Done - 23/10/07 - Marianne - Request for basic documentation for restarting the Bookkeeping services Done - 27/11/07 - Andrew - Make proposal for CS SRM2 SE definitions 1. Production Status Report Minutes from the production meeting are available here. Gianluca reported that 1991-3 are completed. 2000-1 are ongoing but the files are staging and 10-20% are failing with exceeded maximum staging retry. There was a problem at NIKHEF due to the mapping of Joel's credential at the site but this has now been resolved. Roberto and Gianluca are to prepare an SRM sensor test for SAM. ( ACTION: Gianluca, Roberto ) Problems with a missing library for Boole were found at Zurich by Roland. Joel commented about the data sanity agent reports that are showing many blocked tapes at CERN, this should be conveyed to the Castor support team. ( ACTION: Gianluca). Joel also reported that for the stripping all jobs have been submitted to 4 of the Tier-1 sites but jobs for the remaining 3 are pending end of downtime etc. Alexei has tracked down the problem with sporadic failures at GridKa relating to the LD_LIBRARY_PATH and Andrei agreed to investigate this further with Alexei. ( ACTION: Andrei ) 2. Production Operations Issues - v2r18p1 release Andrei compiled the v2r18p1 release with a bug fix in the Transfer Agent. Raja has installed this release on all the VO-boxes. - volhcb01 -> volhcb05 migration The user system has been migrated to volhcb05 and users have transparently started using this machine. Joel was asked to investigate whether a 1TB local disk could be added to this machine. volhcb01 should be upgraded to SLC4 and the large local disk still be used to store the log files. ( ACTION: Joel ) For the older machines: - lxgate03 - upgrade to SLC4 without touching the DIRAC installation after Andrei checks the location of the databases ( ACTION: Andrei ) - lxgate05 - can be renamed to volhcb06 ( ACTION: Joel ) - lxgate34 - Andrew should confirm the status of this machine ( ACTION: Andrew ) - lbnts2 - can be retired. - Bookkeeping services on volhcb05 ( LFC access ) Currently the BK is running on volhcb01 so this cannot be upgraded until the switchover to volhcb05. This is ongoing but will occur when the LFC access problems for the BK are resolved. After the migration, volhcb01 will become the BK prototyping machine. Andrei suggested migrating the startup scripts to use runit (to be consistent with other DIRAC services) such that the Grid environment can be setup. ( ACTION: Marianne, Andrei ) - RAL migration After yesterday's intervention in dCache the FTS channels were not reactivated. Migration is therefore currently on-hold. - PIC migration The PIC migration for disk will be complete whenever submitted requests are satisfied. There are problems for migration of tape-resident files and this is ongoing. 3. DIRAC3 Stuart reported that a working Job Agent and Job Wrapper are in place and effort will go into the Pilot script and Agent Director. Joel has made the dirac-install and dirac-setup scripts available in CVS. A problem was reported to Gennady with recreating workflows from XML and is being investigated. The full chain of execution is almost in place so DIRAC3 will be used to perform SRM2 tests. Joel has a version of the GaudiApplication module working with python options and is continuing with dual support for options in the same module. 4. AOB Andrei will compile a DIRAC overview abstract for the EGEE User Forum since the deadline is now for 10th December.
There are minutes attached to this event. Show them.
    • 09:30 → 09:45
      Ongoing actions 15m
    • 09:45 → 10:00
      Production status report 15m
      - Report from the Production meeting: - running application at GridKa - extra libraries for Zurich
    • 10:00 → 10:30
      Production operations issues 30m
      - v2r18p1 release - volhcb01 -> volhcb05 migration - Bookkeeping services on volhcb05 ( LFC access ) - RAL migration - PIC migration
    • 10:30 → 11:00
      DIRAC3 tasks 30m
      - Status of DIRAC3 for SRM2 tests
    • 11:00 → 11:10
      AOB 10m