Thermosiphon meeting

→ Europe/Zurich
298/1-003 (CERN)

298/1-003

CERN

10
Show room on map
Michele Battistin (CERN)
    • 10:00 → 10:10
      Budget situation 10m
      - offer for the brine skid insulation (Daniel) - offer for the balcony unit insulation (Daniel) - offer for the brine flowmeter (Pierre) - cost to completion estimation for the scaffolding (Daniel)
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 10:10 → 10:20
      Urgent matters 10m
      - to be filled
    • 10:20 → 10:30
      Ice Risk - Safety analysis document 10m
      Speaker: Jose Antonio Botelho Direito (CERN)
      Slides
    • 10:30 → 10:40
      Document database update 10m
      Speaker: Alexander Bitadze (University of Glasgow (GB))
    • 10:40 → 10:50
      Water circuit - Pipe + pump skid 10m
      - Pump skid done: instrumentation? - pipe installation on-going
      Speaker: Stefano Moccia (CERN)
    • 10:50 → 11:00
      Chiller - J&E Hall 10m
      - J&E Hall on site: works advancement. - status of the connections
      Speaker: Olivier Crespo-Lopez (CERN)
    • 11:00 → 11:10
      Brine skid + piping 10m
      - brine skid: info from SXL1 (Cyrill) - brine piping installation (Daniel) - brine diaphragm flowmeter (Pierre)
      Speakers: Cyril Degeorge (I), Daniel Lefils (CERN), Pierre Bonneau (CERN)
    • 11:10 → 11:20
      C3F8 Condenser Installation 10m
      - Steel structure on the SH1 installation planning (Michele) - Condenser supply: pipe support problem (Enrico) - Mechanical installations around the condenser (Pierre) - Degassing system (Cyrill + Pierre) - purchase of the small valve for slow liquid filling (Pierre)
      Speakers: Cyril Degeorge (I), Dr Enrico Da Riva (CERN)
    • 11:20 → 11:30
      C3F8 pipe installation update 10m
      - Balcony-compressor room part: Didier pipe advancement (Daniel) - DN50 compensator replacement (Daniel)
      Speaker: Daniel Lefils (CERN)
    • 11:30 → 11:40
      TS electrical cupboards construction advancement 10m
      - end of the electrical cupboard construction - delivery time for the power cubicle form CCM (Olivier)
      Speaker: Florian Corbaz (CERN)
    • 11:40 → 11:50
      Instrumentation 10m
      Speaker: Pierre Bonneau (CERN)
    • 11:50 → 12:00
      USA15 "balcony" assembly status 10m
      - Iuri and Michail intervention on the structure (Cyril) - Skids installation in USA15: transport problems (Olivier) - Installation planning (Olivier)
      Speakers: Cyril Degeorge (I), Pierre Bonneau (CERN)
    • 12:00 → 12:10
      Electrical Power Supply and Cabling 10m
      - Diesel power problem: last news from J&E Hall (Michele) - new version of the Electrical requirements document (Jose) - HP connection EN/EL: advancement status (Olivier) - Jan: LP + instrumentation connection: Sergei Malukov advancement status. (Jan)
      Speakers: Daniel Lefils (CERN), Wieslaw Iwanski (CERN)
    • 12:10 → 12:20
      Control 10m
      Speakers: Lukasz Zwalinski (CERN), Stephane Berry (CERN)
    • 12:20 → 12:30
      2 kW Thermosiphon Tests 10m
      - status of the test report
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 12:30 → 12:40
      Safety file 10m
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 12:40 → 12:50
      Commissioning procedures 10m
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 12:50 → 13:00
      Any Other Business 10m