- offer for the brine skid insulation (Daniel)
- offer for the balcony unit insulation (Daniel)
- offer for the brine flowmeter (Pierre)
- cost to completion estimation for the scaffolding (Daniel)
Speaker:
Jose Antonio Botelho Direito(CERN)
Slides
10:20
→
10:30
Urgent matters10m
- installation of the platform for balcony unit transport
- Diesel power installation: EL to present solution to ATLAS
10:30
→
10:40
Ice Risk - Safety analysis document10m
- Inficon contact for leak search
Speaker:
Jose Antonio Botelho Direito(CERN)
document
10:40
→
10:50
Document database update10m
Speaker:
Alexander Bitadze(University of Glasgow (GB))
10:50
→
11:00
Water circuit - Pipe + pump skid10m
- Pump skid done: instrumentation to be installed
- pipe installation waiting for end of brine pipe + water skid installation
Speaker:
Stefano Moccia(CERN)
11:00
→
11:10
Chiller - J&E Hall10m
- J&E Hall on site: works advancement.
- status of the connections
Speaker:
Olivier Crespo-Lopez(CERN)
11:10
→
11:20
Brine skid + piping10m
- brine skid: info from SXL1 (Cyrill)
- brine piping installation (Daniel)
- brine diaphragm flowmeter (Pierre)
Speakers:
Cyril Degeorge(I), Daniel Lefils(CERN), Pierre Bonneau(CERN)
11:20
→
11:30
C3F8 Condenser Installation10m
- Steel structure on the SH1 installation planning (Michele)
- Condenser supply: pipe support problem (Enrico)
- Mechanical installations around the condenser (Pierre)
- Degassing system (Cyrill + Pierre)
- purchase of the small valve for slow liquid filling (Pierre)
Speakers:
Cyril Degeorge(I), DrEnrico Da Riva(CERN)
TS electrical cupboards construction advancement10m
- end of the electrical cupboard construction
- delivery time for the power cubicle form CCM (Olivier)
Speaker:
Florian Corbaz(CERN)
11:50
→
12:00
Instrumentation10m
Speaker:
Pierre Bonneau(CERN)
12:00
→
12:10
USA15 "balcony" assembly status10m
- Iuri and Michail intervention on the structure (Cyril)
- Skids installation in USA15: transport problems (Olivier)
- Installation planning (Olivier)
Speakers:
Cyril Degeorge(I), Pierre Bonneau(CERN)
12:10
→
12:20
Electrical Power Supply and Cabling10m
- Diesel power problem: last news from J&E Hall (Michele)
- new version of the Electrical requirements document (Jose)
- HP connection EN/EL: advancement status (Olivier)
- Jan: LP + instrumentation connection: Sergei Malukov advancement status. (Jan)
Speakers:
Daniel Lefils(CERN), Wieslaw Iwanski(CERN)