Librarian and Integrators meeting (6 Nov 2012)
Attendees:
Ben Couturier, Victor Diez, Giulio Eulisse,
Gunter Folger, Benedikt Hegner, Emil Obreshkov,
Andrea Valassi (additions via email)
Announcements:
None
New action items:
Discuss python2.7 status in ATLAS/LHCb <-- action Emil/Ben
Make rpm work higher priority <-- action Benedikt
Previous action items:
Find out about icc13 status <-- action Benedikt
Prepare static build of cmake <-- action Victor (done)
Discussion on fastjet
=====================
ATLAS and LHCb both are fine with upgrading to fastjet 3.
Round table:
============
SPI:
----
first build of externals with gcc 4.7.2/C++ is ready and
the platform has been added to the nightlies.
Reporting about Apple on ARM rumours.
MacOSX Mountain Lion migration still ongoing
ATLAS:
------
using gcc 4.3.6 as compiler now
now trying gcc47 on slc6 for development builds
asking for clang 3.2 once released (Benedikt: we'll add to the agenda)
icc13 still on the wish list
ATLAS is fine with moving to fastjet 3.0.3
Experienced castor problem with changing headers (https://cern.service-now.com/service-portal/view-incident.do?n=INC172716)
CMS:
----
Moved to gcc47/C++11. Started to use C+11 features.
Experienced same castor problem as ATLAS
Reported issue of clang with variable length array; C99 compatible code breaks compilation; not really part of the C++ standard, but support by gcc exists. will be fixed in next clang version.
Link-time optimisation tests very successful; will apply whereever possible
started merging plugins+pure libraries, wherever the library is just only by one single plugin; LTO makes plugin libs even smaller than before
ROOT:
-----
preparing for ROOT 6.0.0. First release with cling
PF (via email):
---------------
request to update oracle client 11.2.0.3.0 soon. Currently testing.
LHCb:
-----
Asking for meetings for
o discussion about how to keep CMT and Cmake version of LCG interfaces in sync
o status of nightly build infrastructure (Benedikt: we will move to Electric Commander)
Requesting the rpm plans to get higher priority
Has to x-check again for fastjet 3.
GEANT4:
-------
in the process of preparing end of the year release.
There are minutes attached to this event.
Show them.