phone conference

Europe/Zurich
28-R-006 (CERN)

28-R-006

CERN

Description
Use these links to join the conference toll-free: Participants Leader Or dial +41227676000 and enter access code 0160191 (leader code: 0150218) Mailing list: wlcg-srm-production-deployment@cern.ch Web archive: here
    • 16:30 16:35
      Notes from last call 5m
      Minutes of the SRM v2.2 management meeting ========================================== Date: 12 November 2007 Attendees: Flavia Donno (FD), Gene Oleynik (GO), Harry Renshall (HR) Minutes produced by FD - Status of the implementations dCache: FD reported that the only 2 remaining open issues with dCache are listed in the implementation issues twiki pages and they are not critical. GO requested those problems to be reported to support@dcache.org: we should move to a production mode of operations where the GSSD twiki page is no longer used for problem reporting. FD and HR agree: GSSD will organize support for storage management, organize and identify second level support, and define the channels and the procedures to be followed. CASTOR: FD reported that ew issues were identified by LHCb using high-level tools. The issues have being reported as savannah bugs and are being addressed by Shaun De Witt. The fix will be available with CASTOR SRM v 1.3.1. StoRM: FD: The remaining SRM v2.2 issues will be cured with release 1.4.1 that will come out before Christmas. LHCb discovered a few bugs during their tests. The fix has being provided and tests will be defined during the workshop in Edinburgh. DPM: FD: Nothing to report. - Status of the sites CASTOR: FD: The CASTOR team at CERN is setting up an SRM v2.2 production endpoint for LHCb. A few not yet understood problems showed up. They are due most probably to the installation with Quattor. Problems are being investigated. However, the endpoint is now operational and has been released to LHCb. CASTOR@CNAF has been working OK during the LHCb exercises. However, today the endpoint has problems that are being investigated. The endpoint does not pass the SAM tests because they advertise it as well as an SRM v1 endpoint in the production information system. This might cause problems during experiment tests. The test endpoint at RAL has also been released to LHCb for testing. It is being validated now by FD. dCache: FD: The SRM v2.2 endpoints are not in good shape. NDGF and BNL do not pass S2 tests. Most of the endpoints are not correctly published in the BDII. This prevents the experiments from using them. NDGF has upgraded to dCache 1.8.0-1 in production with space management turned off. FZK has upgraded to dCAche 1.8.0-1 in production with space management turned on. So far the upgrade went smoothly for all sites. The sites are operational. DPM: The only site available for experiment tests, LAL, does not pass the BDII and high-level tools tests. Michel Jouvain said that he does not have time to look into the setup till December 2007. ATLAS would like to test a DPM SRM v2.2 endpoint. Therefore, if not LAL, some other site should be identified. StoRM: The endpoint is not correctly published. - Status of experiment tests LHCb: The tests are ongoing following the schedule. High-level tools are now being tested. The integration of SRM v2.2 in the DIRAC framework will be completed at the beginning of December. ATLAS: ATLAS presented a test detailed plan. Last week they have completed the integration of their DM framework with SRM v2.2. Tests will resume this coming week. - High-level tools FD asked GO if gfal/lcg-utils will be installed on the OSG Worker Nodes. GO answered that Alain Roy is looking on how to distribute these tools through VDT. Ruth is pushing to have just one version of the high-level tools in OSG. It is not sure if this is feaseable. gfal/lcg-utils are being evaluated by OSG and compared to the srm* clients part of the dCache distribution. GO will let us know the result of these activities and the official position of OSG in terms of high-level tools. Next meeting: 19/20 are an LHCC review so the next meeting is proposed for 22 Nov at 15.30.
    • 16:35 16:55
      Status of upgrades and tests 20m
    • 16:55 17:00
      AOB 5m