6th HiLumi WP2 Task Leader Meeting

→ Europe/Zurich
6/R-012 - conference room (CERN)

6/R-012 - conference room

CERN

40
Show room on map
<DRAFT>

Present: TP OB JU MG EM GA RDM AV AW

Introduction and News from US-LARP meeting.

Gianluigi announced the structure and the scope of the next WP2 meetings, news from LARP, communication for the coming IPAC13 conference and HiLumi report.

The presentations at the US/LARP meeting can be found at:

https://indico.fnal.gov/conferenceOtherViews.py?view=standard&confId=6164

Concerning the HiLumi report. An updated version of the contributions for the various WP should be sent to Gianluigi by Sunday 5/5/2013.Action: Task Leaders.

During the talk it was discussed about the recent 7 MV performance at 2 K of the SLAC-ODU crab cavity design. AW ask if there is any consequence for the optics. OB replied that, while very encouraging, it is only the first of a series of tests eventually with beam. The project has still as baseline 3.4 MV per module and the cooling options between 2 K and 4 K have not been decided yet.

The layout with an additional Q7 magnet should be further developed for the time being as a back-up solution in case the excellent results above are not confirmed.

 

Status of Task 2.4

Elias illustrated the plans for RF heating, electron cloud and impedance in terms of simulation and modeling describing the role of link persons for various pieces of equipment and the newcomers. In particular an impedance estimation for HL-LHC is due for 1/11/2013. JU reminded that the TDI for the HL-LHC will be very different from the current one. Gianluigi noted that the baseline layout up to D1 at least has been agreed and the dimensions of the beam screens are defined. It would be important to start running simulations for electron cloud effects in the triplets/D1 in the presence of both beams.  GA asked whether it would make sense to start to collect the information on the layout and parameters that are being used by various team to improve the consistency and the comparison between results. The participants thought that this would be useful but OB reminded that the PLC is addressing the issue and the EDMS team have been already mandated to setup the correct structure for the HL-LHC project. A first feedback is expected at the end of the year. So the official files for layout and parameters should appear in the PLC page. The WP2 web site could contain information relevant for the simulations and studies that are being performed.


Status of Task 2.5

Alexander illustrated the plans and how the simulation tools already respond and are planned to be upgraded to the needs. The topic touched were baseline DA, leveling scenarios, strong strong beam-beam with impedance and feedback, multi bunch effect (pacman and instabilities). Sixtrack and LifeTrac are being benchmarked on 6D beam-beam, thin multipole and closed orbit.  Eventually the collaborator list and collaboration setup have been shown. Few inconsistency between sixtrack

simulations have been mentioned, but TP confirmed that they were addressed and solved. Concerning SixTrack it was mentioned that while it support a crab cavity element, the 6D beam beam lens does not support the crab cavity tilt effect on the strong beam.


Next meeting

7^th May at 16:00 in room 6-R-018

Agenda:

  1. Layout triplet-D1 and possible modifications – Info form WP3 for feedback and discussion (Gianluigi)
  2. Status report of Task2.2 (Bernhard)
  3. Status report of Task2.3 (Massimo)

Round Table

There are minutes attached to this event. Show them.
    • 16:30 → 16:50
      Introduction and News from US-LARP meeting 20m
      Speaker: Gianluigi Arduini (CERN)
      Slides
    • 16:50 → 17:10
      Status of Task 2.4 Collective Effects 20m
      Speaker: Dr Elias Metral (CERN)
      Slides
    • 17:10 → 17:30
      Status of Task 2.5 Beam-Beam Effects 20m
      Speaker: Alexander Valishev (Fermilab)
      Slides