Minutes of the 8th WP2 Task Leader Meeting held on 21/5/2013
Present: G. Arduini, O. Brüning, B. De Girolamo, M. Giovannozzi, B. Holzer, E. Métral, A. Valishev.
 
Minutes of the previous meeting and follow-up of actions
Elias has discussed with N. Mounet, G. Rumolo and F. Zimmermann. A preliminary answer concerning the dependence of the electron cloud effects and impedance at the triplet with two counter-rotating beams will be provided by the end of June. Final data will require more time.
Maria Navarro Tapia (fellow under Rama Calaga’s supervision) will provide information on the expected amplitude of the RF multipoles at the crab cavities.
General Information
Gianluigi thanked the WP2 contributors to the first HiLumi report (18 month). A draft has been sent to Lucio and Oliver on 15/5/2013.
Oliver mentioned the work presented by Andrea Apollonio at IPAC13. Andrea has presented a first estimate of the expected integrated luminosity for HL-LHC as a function of average fault duration and failure rate based on the 2012 experience. This shows that a reduction of the average fault duration by 50% and of the failure rate by 10 % would be required in order to achieve 250 fb-1/year. It is therefore important to intervene on the fault rates that require accesses and long interventions.
Status of Task 2.2
Bernhard gave a summary of the activities and results obtained for Task 2.2: the main differences in layout as compared to the nominal LHC and the optics HL_LHCv1.0 were outlined. Fringe fields of the large aperture triplets have been studied and their effect studied in terms of beta-beating but the effect has not been compensated yet. The fringe fields of individual quadrupole magnets have been studied but the effect of the proximity of two consecutive magnets needs to be verified. Action: Gianluigi to contact Ezio for that. The symplectic integration of fringe fields has to be introduced in the tracking simulations. Action: Anton Bogomyagkov, Massimo.
A preliminary solution has been studied to enhance the beta function at the crab-cavities location to increase the resulting tilt at the IP in case the crab cavity nominal voltage of 4.2 MV/cavity cannot be achieved. This solution foresees the installation of an additional Q7 magnet and different positions for the Q4/Q5/Q6 magnets but the implications have not yet been checked with the magnet team.
The optics transitions between injection and collision have been studied and the corresponding evolution of the currents/gradients have been approved by the Magnet Team (Ezio, Per). Gianluigi and Massimo noted that the orbit and chromaticity evolution should be studied during the transitions. Action: Task 2.2.
Oliver noted that the specifications for the accuracy, reproducibility, stability and resolution should be reviewed in particular for the triplets. Action: Task 2.2.
Round Table
Massimo has passed the specifications for the triplet error table to Ezio.
There was some discussion on the use of the proper flags for the activation of the beam-beam kicks and of the 6D lens in SixTrack.  Elias passed this link to a previous presentation of F. Schmidt on the subject (see point 5 in http://emetral.web.cern.ch/emetral/ICEsection/2011/2011-04-20/ICE%20Min%20meeting_20-04-11.htm )
Gianluigi announced that Bernhard has taken over new responsibilities in the European Network on Novel Accelerators (EuroNNAc) and, given the progress in the activities for Task 2.2 and the need now to focus on the optimization of the lattice with respect to tracking and magnetic error specifications, he has agreed with Massimo and Bernhard that Massimo will take over the coordination of both Tasks 2.2 and 2.3. Gianluigi profited of this occasion to thank Bernhard for the excellent progress in the activities of Task 2.2.
 
 