LHC Beam Dump System - Technical Audit

Monday 28 January 2008 - 08:30
CERN (32/1-A24)

        : Sessions
    /     : Talks
        : Breaks
28 Jan 2008
AM
09:00
I. Overview (until 11:20) (32/1-A24)
09:00 Introduction to audit - Volker MERTENS  
Slides
09:10 LHC machine protection and main elements - Rudiger SCHMIDT  
Slides
09:25 LBDS overview and subsystems - Brennan GODDARD  
Slides
09:45 Dependability requirements and design implications - Jan UYTHOVEN  
Slides
10:10 Kicker magnets and generators - Laurent DUCIMETIERE  
Slides
10:30 --- Coffee break ---
11:00 Kicker electronics and slow control - Etienne CARLIER   (32/1-A24)
Slides
11:25
II. Key safety critical functionalities and realisation (until 15:15) (32/1-A24)
11:25 Interfacing to BIS and synchronisation (TSU) - Alain ANTOINE  
Slides
11:50 Trigger signal distribution - Nicolas VOUMARD  
Slides
12:05 Power triggering - Etienne CARLIER  
Slides
12:20 Retriggering - Gregor GRAWER  
Slides
12:30 --- Lunch break ---
14:00 BETS - real time tracking - general - Nicolas VOUMARD   (32/1-A24)
Slides
14:10 BETS - beam energy acquisition and optical transmission - Gregor GRAWER  
Slides
14:20 BETS - beam energy meter, beam energy acquisition and beam energy controller - Nicolas VOUMARD  
14:35 BETS - feedback tracking - general - Alain ANTOINE  
Slides
14:45 Post operational checks - Nicolas MAGNIN  
Slides
14:55 Logging - Nicolas MAGNIN  
Slides
15:05 Post operational check - XPOC - Eric GALLET  
Slides
PM
15:15 --- Coffee break ---
15:30
III. Operational aspects (until 16:10)
15:30 Arming and re-arming - Etienne CARLIER  
Slides
15:40 Testing before operation - experience and plans - Jan UYTHOVEN  
Slides
15:50 Environmental aspects (EMC, radiation, UPS, ..) - Etienne CARLIER  
Slides
16:00 Maintenance and spares - Etienne CARLIER Laurent DUCIMETIERE  
Slides