09:00
|
I. Overview
(until 11:20)
(32/1-A24)
|
|
09:00
|
Introduction to audit
-
Volker MERTENS
|
|
09:10
|
LHC machine protection and main elements
-
Rudiger SCHMIDT
|
|
09:25
|
LBDS overview and subsystems
-
Brennan GODDARD
|
|
09:45
|
Dependability requirements and design implications
-
Jan UYTHOVEN
|
|
10:10
|
Kicker magnets and generators
-
Laurent DUCIMETIERE
|
|
10:30
|
--- Coffee break ---
|
|
11:00
|
Kicker electronics and slow control
-
Etienne CARLIER
(32/1-A24)
|
|
11:25
|
II. Key safety critical functionalities and realisation
(until 15:15)
(32/1-A24)
|
|
11:25
|
Interfacing to BIS and synchronisation (TSU)
-
Alain ANTOINE
|
|
11:50
|
Trigger signal distribution
-
Nicolas VOUMARD
|
|
12:05
|
Power triggering
-
Etienne CARLIER
|
|
12:20
|
Retriggering
-
Gregor GRAWER
|
|
12:30
|
--- Lunch break ---
|
|
14:00
|
BETS - real time tracking - general
-
Nicolas VOUMARD
(32/1-A24)
|
|
14:10
|
BETS - beam energy acquisition and optical transmission
-
Gregor GRAWER
|
|
14:20
|
BETS - beam energy meter, beam energy acquisition and beam energy controller
-
Nicolas VOUMARD
|
|
14:35
|
BETS - feedback tracking - general
-
Alain ANTOINE
|
|
14:45
|
Post operational checks
-
Nicolas MAGNIN
|
|
14:55
|
Logging
-
Nicolas MAGNIN
|
|
15:05
|
Post operational check - XPOC
-
Eric GALLET
|