      Action List 10m
      Cabling: Florian will do a tour with INEO to identify the missing connection. Cyrill has just installed (Monday evening) a TT under the condenser. It shall be connected by INEO. Pneumatics: all the pneumatics connection are missing: Cyril is taking over Mapping of the pneumatic valves Mapping of the pneumatic actuators Check of the available piping Connections on both sides. The support of Michail and Jyri shall be asked to Jan A TT is missing on the C6F14 circuit close to the condenser: Pierre will dismount one of the two connections (flange to flange 10- 20 cm long) that has been done for the flexible pipes connections and Sylvain will install a "doit de gant" there. By-pass of the C6F14 to clean the line before connection the condenser. It shall be designed (Pierre?) and realised (Sylvain?). H2O circuit lagging. Iniziative does not have time to do it. Tchuflan gave the offer. Michele will discuss it with Beniamino for funding. Execute small insulation on the by-pass (between lamination valve and HEX. Finish the insulation on the roof Put the leak check form scanned on EDMS (Pierre) Install actuator DN200 over the balcony unit (50 kg). We need to install a hook on the roof. Contact the transport. Modify the actuator of the valve PCV2102B from NC to NO. Check connections on the H2O skid Etiquettes: insert all the equipments on the Guillermo database to have the etiquettes done. Cyrill to install the database. The chiller equipment shall be entered too Etiquettes for external installation to be done. Fix the pipe passages on different locations Modify and re-install the stairs to go around the cryogenic pipe close to the C6F14 pumping station. Protection over the hole for the passage of the pipes from the chiller zone to the technical gallery Ask Wieslaw confirmation that we can put power on all the cupboards. Dismounting of the scaffolding if Jan team has finished the fixation of the N2 line
    • 10:10 → 10:50
      Actions List Review 40m
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)