    • 10:00 → 10:10
      Action List 10m
    • 10:10 → 10:50
      Actions List Review 40m
      Water P&ID: the P&ID does not correspond to the Thermosiphon P&ID Onsite label shall be removed and changed to use the TS naming!!! A conversion table shall be sent to Iniziative (Cecilia) The table shall be done to Iniziative to change the names on the database they are producing (Claudio). Cabling: visit this morning with Florian (he will connect everything when all mechanical part is done) Water circuit: no GS on valve GS1531 and the GS on the HV1530 – Cecilia is taking over Condenser: one TT on the bottom of the condenser + the TT of Sylvain on the C6F14 installed – they have to be cabled - Florian Swagelock by-pass valve on the liquid line PV1103 has been installed: to be cabled. Sonar part: it will be installed in the next two weeks. To be cabled. Brine: FT1350 to be cabled. By-pass: actuator of valve PV2201 switch to be cabled. On all the external cabling all the "penduilles" shall be black and the white ones shall be taken out (the sun will destroy them) (Cyril = Juri and Michail) External cable tray protection should be in Prevessin now. Scale of the condenser to be connected. Check the signal of the scale of the condenser. One power cable is missing: Mito shall lay it down. Nacelle interference in SX1. It can be done after Open Days. Florian to purchase a new cable. We will cable: Red telephone 16 A socket One pipe for vacuum network. Pneumatics: All done but: Cleaning the aorta for the Open Days - Cyril Balcony: actuator to be installed and connected. Valve installed. Pneumatic mapping - DONE By-pass of the C6F14 to clean the line before connection the condenser. We habve the filer. Sylvain shall assembly now. Finish the insulation on the roof is possible now. We wait for the final connection to the condenser of the C6F14. Leak check is finished!!! Put the leak check document from scanned on EDMS (Pierre). DONE Validation test shall be performed. Actuator DN200 over the balcony installed. The valve shall be NORMALLY CLOSED. The actuator shall be rotated (Pierre + Olivier). Chiller: Cyrill to install the CE plates of the heat exchangers and tanks of the chiller. Etiquettes: Pierre is filling the Infor database on excel format Claudio to retrieve the information form Stefano Moccia concerning Water circuit Claudio to recuperate the information for the chiller. To be asked to J&E Hall (Michele). Once done we can produce the etiquette. Olivier has bought the etiquette printer. Training foreseen in the next weeks. Etiquettes for external installation to be done. Hard etiquettes shall be produced (Claudio). Fix the pipe passages on the walls on different locations: Michele sent mail to Eliseo. No answer for the time being. Protection over the hole for the passage of the pipes: ready. To be done airtight. Check the procedure to fill-empty the C6F14 line to connect it to the condenser after cleaning. Filling at filter level Emptying from the technical gallery. Install the dryers and try the filling pump (Pierre + Cyril) after installation of the by pass. Red telephones (Olivier): Install a red telephone on the roof move the red telephone form the balcony moved tomorrow. No news… Ask Eliseo concerning the roof on the condenser (Michele): before snowing… Protect the cable tray on the roof Cyril will provide elements to Olivier to call the supplier. Material should be in Prevessin now. Control: answer from J&E Hall received: Michele and Lukasz to call them today or tomorrow. H2O: PV1501 is on-off instead that control valve. Ok for Stefano. The pump is not fixed. DONE Electrical cupboard HSE visit certification: Florian has given the document to Anders. Michele to ask Anders. Power on all the cupboards Wieslaw said whenever we want. Waiting for HSE certification. Documentation: Ceclia to suggest a folder structure for EDMS. Claudio to prepare the commissioning forms starting form the commissioning document of Jose. Brine temperature regulation to be checked… Pierre is searching the pneumatic actuator with positioner. Pierre to search for an Electrical actuator too. From EL and control point of view it is fine. Thermosiphon PLC program is ready: under simulator now. Ask for Benjamin presentation (Michele).
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)