Early Commissioning Results of the NSLS-II High Power RF Systems

13 May 2014, 12:00
30m
Hotel NH Trieste (Elettra - Sincrotrone Trieste)

Hotel NH Trieste

Elettra - Sincrotrone Trieste

Hotel NH Trieste Corso Cavour 7 34132 Trieste Italy
Oral presentation SPC judgements Tuesday morning 2

Speaker

Mr James Rose (Brookhaven)

Description

The NSLS-II has completed early commissioning with the booster synchrotron utilizing a 80 kW IOT transmitter powering a 7-cell “PETRA” like cavity and the storage ring a 300 kW klystron transmitter powering an identical cavity. The 7-cell cavity in the storage ring will be replaced with a “CESR-B” like superconducting cavity during the May 2014 shutdown. Both the klystron and IOT transmitters use switching HV power supplies with redundant switches and programmable switching algorithms that can suppress AC power line harmonics. Early results are presented.

Primary author

Mr James Rose (Brookhaven)

Co-author

Dr Feng Gao (Brookhaven Lab)