13–16 May 2014
Elettra - Sincrotrone Trieste
Europe/Zurich timezone

Session

Thursday afternoon 1

15 May 2014, 14:00
Hotel NH Trieste (Elettra - Sincrotrone Trieste)

Hotel NH Trieste

Elettra - Sincrotrone Trieste

Hotel NH Trieste Corso Cavour 7 34132 Trieste Italy

Conveners

Thursday afternoon 1

  • Patrick Marchand (Synchrotron SOLEIL)

Presentation materials

There are no materials yet.

  1. Stefan Choroba (DESY)
    15/05/2014, 14:00
    SPC judgements
    Oral presentation
    The European XFEL requires twenty-seven high power RF stations at 1.3GHz capable of a peak RF power of 10MW at 1.37ms pulse duration and 10Hz repetition rate. Twenty-five RF stations supply RF power to one-hundred cryogenic modules each with eight nine-cell superconducting cavities. Two RF stations are reserved for the RF gun and one cryogenic module in the injector of the European XFEL. Each...
    Go to contribution page
  2. Mr Gianfranco Trento (Argonne National Laboratory)
    15/05/2014, 14:30
    SPC judgements
    Oral presentation
    Two of the Fiscal Year 2014 Radio Frequency (RF) Group machine operation goals are to maintain mean time between faults at 100 hours or better and maintain injector, storage ring (SR), and x-ray production availability at 97% or better. To continue to meet these goals, an aggressive approach was instigated to combat parts obsolescence and aging of the accelerator systems. The latest...
    Go to contribution page
  3. Yong Luo
    15/05/2014, 15:00
    SPC judgements
    Oral presentation
    In order to increase beam transmission efficiency and intensity of ion beams, a major upgrade project has been conducted at Argonne Tandem Linac Accelerator System (ATLAS). A 4-meter long 60.625 MHz CW radio-frequency quadrupole (RFQ) has been developed, built and commissioned with beam in 2012. The RFQ has been used in the regular operation since January, 2013 and is capable of providing 295...
    Go to contribution page
Building timetable...