3–7 Mar 2008
CERN, CCC Conference Room
Europe/Zurich timezone

Session

Session 5 - Beam Plans for Accelerator Physics Systems

05
6 Mar 2008, 08:30
CERN, CCC Conference Room

CERN, CCC Conference Room

874-1-011

Presentation materials

There are no materials yet.

  1. Marek Strzelczyk, Thys Risselada
    06/03/2008, 08:30
    Data base implementation in LSA. Procedures for uploading optics versions in to the LHC. Overview of the provided optics versions.
    Go to contribution page
  2. Stefano Redaelli
    06/03/2008, 09:10
    Aperture model for the LHC. Summary of known aperture bottlenecks (e.g. Q2) and their documentation in the CCC. Procedures for the safe measurement of aperture in the LHC.
    Go to contribution page
  3. Rogelio Tomas Garcia
    06/03/2008, 09:45
    Procedures for measuring for verifying the optics in the LHC. Summary of correction algorithms and their implementation in LSA.
    Go to contribution page
  4. Jorg Wenninger
    06/03/2008, 10:50
    Commissioning strategy for the orbit correction system (BPM errors; k-modulation). Options for feed back loop on orbit. Orbit correction in the LHC IR and collimation regions. Strategy for orbit threading.
    Go to contribution page
  5. Ralph Steinhagen
    06/03/2008, 11:25
    Commissioning strategy for the tune and chromaticity correction systems. Options for feed back loop on tune and chromaticity.
    Go to contribution page
  6. Frank Zimmermann
    06/03/2008, 14:00
    Procedures for measuring beam emittances in the LHC. Tools for minimizing emittance blow up during injection, ramp and squeeze. Procedures and tools for transfer line to LHC matching.
    Go to contribution page
  7. Massimo Giovannozzi
    06/03/2008, 14:35
    Procedures for adjusting the non-linear correction circuits in the LHC. Procedures for verifying the correction circuit settings
    Go to contribution page
  8. Laurette Ponce
    06/03/2008, 15:40
    Procedures for calibrating loss patterns. Operational scenarios given measured BLM losses. Threshold adjustment and masking disabling during operation.
    Go to contribution page
  9. Frank Schmidt
    06/03/2008, 16:15
    Basic tasks and options. Implementation
    Go to contribution page
  10. Werner Herr
    06/03/2008, 16:40
    Integration into the LSA software and application of online MADX to operation
    Go to contribution page
Building timetable...