Roberto Saban
03/03/2008, 09:00
The major non-conformities encountered, the ongoing work, repairs, etc. (PIMs, connection cryostats, coupling between bus-bars, water cooled cables and flexible connections, etc.). The planning for the coming months.
Bellesia Boris
03/03/2008, 09:20
- Where we come from (a recall of sector 78)
- What was achieved in sector 45: number of circuits, energy of the presently commissioned sector 45,
- how much more do we need for a reasonable energy level
Rudiger Schmidt
03/03/2008, 09:40
o safety, access, resources (qps, interlocks, power converters, MPP, controls), availabilty of systems, etc
o Lessons from sector 4-5
o Parallelism between HWC and machine checkout (partial & full) – resources, expertise, limits
Antonio Vergara-Fernandez
03/03/2008, 10:30
o How can we achieve a machine commissioned for beam operation for mid June?
o Objectives, advantages of HWC to intermediate energy.
o How much time can we gain?
o Can we achieve a commissioned machine for intermediate energy by mid-June? Critical issues for that?
o Is there a safe limit to operate the magnets and the cryogenics for cold check-out, early physics?
Dr
Magali Gruwe
03/03/2008, 11:05
o What is going to happen in the next 6 months?
o Present experience
o Closure of ring, preparation, qualification etc.
o Prerequisites, EIS…
o Access during a sector test
o Is the access system ready for HWC in parallel to a sectorized cold-check out in parallel to HWC and experiment preparation?
Massimiliano Ferro-Luzzi
03/03/2008, 11:35
o What are the experiments going to do from March to the first collisions
o Can they leave with controlled access in the experimental areas in parallel with HWC and Cold-Check-out
o Impact of a Sector test
o How interested are the experiments in a run at intermediate energy?