GLM 17 March 08
Collaborating Projects
FP6:
Infrastructure Status
BalticGrid: 29 sites (14/29 contributing to EGEE prod), 1.5K CPUs, 1.3KTB storage
EUChinaGrid: 12 sites (11/12 contributing to EGEE prod), 2.3K CPUs, 85 TB storage
EUMedGrid: 22 sites (7/17 contributing to EGEE prod), 1.6K CPUs, 174 TB storage
SEE-GRID-2: 35 sites (13/35 contributing to EGEE prod), 1.5K CPUs, 3KTB storage
FP7:
The BalticGrid-II and SEE-GRID-SCI Project Associate (PJAS) posts have been opened, see http://egee-technical.web.cern.ch/egee-technical/jobs/jobs.htm. Although projects' start date is 1st of May, the new associates can start as early as 1st of April to overlap with current associates who are leaving at the end of April. They will join IT-GD-OPS.
The EC Scientific Project Officers (PO) of SEE-GRID-SCI and BalticGrid-II have changed (ex-Enric Mitjana) to Monica Kacik. For a complete list of EC POs:
BalticGrid-II: Monika Kacik
EGEE-III: Enric Mitjana
ETICS-2: Marina Royer
D4Science: Krystyna Marek
GridTalk: Elina Zicmane
EGI-DS: Kyriakos Baxevanidis
SEE-GRID-SCI: Monika Kacik
F Hemmer attended the first GridTalk face-to-face PMB meeting which was held at CERN on 7th March, where they discussed among other things, personnel and hiring issues.
There are minutes attached to this event.
Show them.