BI/TB on post-mortem from injector start-ups

Europe/Zurich
866 2-D05 (CERN)

866 2-D05

CERN

Description
The next BI/TB will cover post-mortem from the injector start-ups by the BI coordinators. The speakers are asked to concentrate on which BI systems had problems during beam commissioning and then evaluate what fraction of these problems could have been detected earlier with a modified/extended check-out list.
    • 1
      Introduction
      Speaker: Mr Lars Jensen (CERN)
      Slides
    • 2
      Post-mortem from LN2/LN3 start-ups
      Could any issue have been caught during hardware/software commissioning or dry-runs?
      Speaker: Federico Roncarolo (CERN)
    • 3
      Discussion for LN2/LN3
    • 4
      Post-mortem from the PSB start-up
      Could any issue have been caught during hardware/software commissioning or dry-runs?
      Speaker: Jocelyn Tan (CERN)
      Slides
    • 5
      Discussion for PSB
    • 6
      Post-mortem from the LEIR start-up
      Could any issue have been caught during hardware/software commissioning or dry-runs?
      Speaker: Dr Eva Barbara Holzer (CERN)
      Slides
    • 7
      Discussion for LEIR
    • 8
      Post-mortem from the PS startup
      Could any issue have been caught during hardware/software commissioning or dry-runs?
      Speaker: Stephane Bart Pedersen (CERN)
      Slides
    • 9
      Discussion for PS
    • 10
      Post-mortem from the SPS start-up
      Could any issue have been caught during hardware/software commissioning or dry-runs?
      Speakers: Andrea Boccardi (CERN), Mr Lars Jensen (CERN)
      Slides
    • 11
      Discussion for SPS