  1. Thierry Stora (CERN)
    19/11/2008, 11:20
    The activities related to Radioactive Ion Beam development at ISOLDE will be reviewed.
    Go to contribution page
  2. Mr Liviu Constantin Penescu (CERN)
    19/11/2008, 11:50
    Within the Marie Curie “HIGHINT” project a detailed study of the FEBIAD ion sources has been done at ISOLDE. As a result, two FEBIAD prototypes have been proposed and successfully tested. For the noble gases, the ionization efficiency was this way increased by about a factor 9, which allowed the identification of the new isotope 229Rn at ISOLDE. Due to this development, an increase of the...
    Go to contribution page
  3. Anna Gustafsson (CERN)
    19/11/2008, 12:10
    Over the last few years the low-energy part of REX, consisting of a Penning trap and Electron beam ion source, has developed from a pure bunching and charge-breeding system to an elaborate set of tools that can be used for different purposes. For instance, half-life determination of 38Ca directly after the trap by making use of the molecular beam cleaning method, as well as providing single...
    Go to contribution page
  4. Richard Catherall (CERN)
    19/11/2008, 12:30
    The increase in proton beam intensity, due to the both completion of Linac 4 and a change in the basic period of the PSB cycle, is an essential criterion for the success of the full HIE-ISOLDE project. In order to accommodate a possible 10µA proton-beam to ISOLDE, a complete overhaul of the existing target area infrastructure is required. A factor of 5 proton-beam increase inevitably leads to...