Meeting #5
•Target T2 T4 T6 upgrade (target box, monitors) (lun – mar)
•MDX support installation (Mar)
•MDX magnet installation (Mar)
•MDX service connexion (Mar)
•Water leaks TDC2
•Réparation des fuites et/ou remplacement des vannes si réparations impossible S5 (B. Bannister)
•Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5
•H6/H8 alignment campaign (TCC2)
•MBW.043089 reinstallation (Mer)
•H6 collimator exchange (Jeu)
•Alignment MDX + collimator + MBW (jeu-ven)
•MBPL 498 magnet to be installed in H4_134 + RE21 shielding
•Re-Connexion of vacuum pipes, collars,.. H6 & H8.
•Beam line configuration for ions H2 H4 H8: https://edms.cern.ch/file/1462531/1/YETS_2014_4162531.pdf
•Revision des coffrets pompes a vide (Jeu-Ven)
•Installation peignes TDC2