SPS CCTC
→
Europe/Zurich
252/1-046 - Salle Reunion RF (CERN)
Description
Working group meeting dealing with the SPS crab cavity installation. This meeting is devoted to short reports (10 -15 min) from
- Cryo infrastructure: Krzysztof
- RF power: Eric
- LLRF: Philippe
- Controls: Luca
Each report should consider:
- description of what is foreseen for your system and status/schedule to date
- description of needed services and interfaces with other systems or components
- estimate of infrastructure footprint ( both at the cryo-module, and at control room or surface building)