Review of actions:
116 - Ricardo: Looked into HEP spec database although contains lots of information.
139 - Ricardo: Far from production, fail to pass the environment from pilot shell to pay load processes.
Roberto: Savanah bug to be filed requesting correct handling of environment. also other configuration issues discovered.
Ricardo: We should only be testing a production system.
Philippe: Wait until Stuart is back. We are not requiring gLexec and we continue to use generic pilots regardless.
144 - Zoltan: Added start date and end date from the query allowing you to select files (closed)
145 - Vladimir: SAM jobs run under lhcb_prod role. Checking the mapping can only be done by checking the permissions on the shared area. New test to be created (Roberto).
146 - Second point (Should be complemented with the installed SW monitoring tools) should become a new action on Joel, Vladimir.
147 - volhcb13 - now installed with SLC4 with 2 disks. Ricardo to begin playing.
volhcb?? - new configuration as discussed with B. Panzer. 7 file systems 1TB has been requested
149 - Closed after successful testing
Production operations:
No production operations yesterday. Last week and over the weekend MC09 sample produced discovered to have B lifetime of 0. New applications being prepared to resolve this. All FEST FULL stream jobs failed while the express stream runs as expected (being investigated). A request was made for the shifters to follow more closely the user activities.
DIRAC Tasks
Infrastructure Monitoring -
Joel: Summary of discussions of SAM to be circulated. Merging infrastructure tests with SAM.
Roberto: Site naming in the dashboard to be programmable (currently hard coded).
SLS monitoring of host ping results linked to lemon.
Ricardo: LFC mirrors being tested?
Roberto: Yes, multiple tests, lfc-lr test and streaming tests.
Bookkeeping:
Zoltan: New updates not released, will check whether the client or service requires a release.
WMS Status:
Ricardo: Update to the priorities based on the group.
Web portal:
Ricardo: System overview page being worked on (Matvey).
Documentation:
Zoltan now writing documentation for the BK.
AOB:
Ricardo: Should be able to limit the number of jobs running per site. Matcher should be provided a list of sites which it can match and the number of jobs. Federico will produce proposal during DIRAC week.
Ricardo: Should we provide site ranking metrics based on SAM success for LHCb? To be discussed during a mini-workshop to be arranged during DIRAC week (8th of June)
There are minutes attached to this event.
Show them.