PASTE meeting

→ Europe/Zurich
2-R-014 (CERN)

2-R-014

CERN

Andrei Tsaregorodtsev
Description
CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 26th May 2009, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: P.Charpentier, J.Closier, G.Cowan, S.Paterson, V.Romanovsky, R.Santinelli, A.C.Smith, F.Stagni Phone: R.Graciani, A.Tsaregorodtsev Apologies: M.Sapunov 0. Ongoing Action List (94) - 23/09/08 - Andrew, Marcos - Using SystemLogging service for dynamic services status monitoring (Andrew to provide FTS example) (111) - 14/09/08 - Alexei,Andrei - Productions with file merging and associated data distribution implementation (116) - 18/11/08 - Ricardo - steer the CPU related activities in DIRAC, document procedures, move to the HEP CPU units (122) - 13/01/09 - Ricardo,Vladimir - Develop specialized SAM Agent to track and report errors with regard to pilots (132) - 03/03/09 - Stuart - Update LFN construction utility to store production output directories as a parameter (133) - 03/03/09 - Matvey - Provide request DB interface page (139) - 31/03/09 - Roberto,Stuart - Track and test glexec as it is deployed at the sites, put CE into production pending the official release (140) - 31/03/09 - Andrew - Formulation of procedure for how to treat banning of sites based on job requirements e.g. input data / staging... (143) - 14/04/09 - Andrei - Update the links in the job monitoring info sent to SiteMonitoring (145) - 21/04/09 - Vladimir,Roberto,Joel - Create SAM sensor to ensure production role is not mapped to sgm at sites (146) - 21/04/09 - Vladimir,Joel - SAM SW installation logic by synchronizing shared areas with the CS SW specification. Should be complemented with the installed SW monitoring tools. (148) - 21/04/09 - Joel - Setup DIRAC SVN/Trac project portal and configure access to the DIRAC developer team. (150) - 26/05/09 - Ricardo,Roberto - Prepare summary in response to Steve Traylen's request (151) - 26/05/09 - Andrew,Andrei - Update central components with optimized BK methods (152) - 26/05/09 - Stuart - Investigate the crashes reported by Ricardo when using the copy local option for DB files (153) - 26/05/09 - Ricardo,Joel - Investigate optimal hardware configurations for DIRAC servers Completed Actions: Done - (147) - 21/04/09 - Joel - Renew the request to IT for deployment of the new LHCb/DIRAC central host machine Done - (149) - 05/05/09 - Ricardo,Andrew - Test the --use-grid SetupProject option to set the LFC_HOST to be used by CORAL with Merging jobs 1. Action Updates - Action(94) - SystemLoggingDB example Ongoing, will be discussed during the DIRAC week in June. - Action(111) - File merging productions Alexei should make use of the production API to generate productions from requests. - Action(116) - CPU studies Roberto circulated a proposal from Steve Traylen, a summary of the LHCb requirements will be prepared by Ricardo and Roberto. ( ACTION: Ricardo,Roberto ) Ricardo has updated the new specint database with the results from his tests, ongoing. - Action(122) - Develop specialized SAM Agent to track and report errors with regard to pilots Ongoing. - Action(132) - Update LFN construction utility to store prod output directories as a parameter This is now possible after the recent production API developments, will be done this week. - Action(133) - RequestDB monitoring Not yet ready after comments from Andrew. - Action(134) - Provide RunDB monitoring page Ongoing. - Action(139) - gLexec testing after deployment at new sites Stuart will begin testing at IN2P3 after discussions with Roberto. - Action(140) - Banning faulty storage elements Ongoing. - Action(144) - BK input data queries The BK updates are available, Andrew and Andrei must update the agents where this is used. ( ACTION: Andrew, Andrei ) - Action(145) - SAM production vs. sgm Action reformulated, new test required. - Action(147) - New machine available Ricardo circulated a proposal for partitioning the disks on the machine. Joel confirmed that this was possible with IT but will take a long time to arrange so it was agreed to continue with what is available, action closed. - Action(148) - Setup DIRAC SVN/Trac project portal and configure access to the DIRAC developer team Ongoing. - Action(149) - Test the --use-grid SetupProject option to set the LFC_HOST to be used by CORAL with Merging jobs Closed last week. 2. Production Status Report - v4r14 DIRAC release Andrei mentioned that v4r14 is in production for the pilots. - WorkflowLib release To be discussed next week. - MC'09 Waiting to see whether some samples should be regenerated after the latest Gauss release is made. 3. DIRAC Tasks To be discussed next week. 4. AOB None
There are minutes attached to this event. Show them.
    • 09:50 → 10:10
      Ongoing actions 20m
      (94) - 23/09/08 - Andrew, Marcos - Using SystemLogging service for dynamic services status monitoring (Andrew to provide FTS example) (111) - 14/09/08 - Alexei,Andrei - Productions with file merging and associated data distribution implementation (116) - 18/11/08 - Ricardo - steer the CPU related activities in DIRAC, document procedures, move to the HEP CPU units (122) - 13/01/09 - Ricardo,Vladimir - Develop specialized SAM Agent to track and report errors with regard to pilots (132) - 03/03/09 - Stuart - Update LFN construction utility to store production output directories as a parameter (133) - 03/03/09 - Matvey - Provide request DB interface page (139) - 31/03/09 - Roberto,Stuart,Ricardo - Track and test glexec as it is deployed at the sites, put CE into production pending the official release (140) - 31/03/09 - Andrew - Formulation of procedure for how to treat banning of sites based on job requirements e.g. input data / staging... (143) - 14/04/09 - Andrei - update the links in the job monitoring info sent to SiteMonitoring (144) - 21/04/09 - Zoltan - propose and implement solutions to reduce the Bookkeeping service load for production input data queries (145) - 21/04/09 - Vladimir,Roberto,Joel - check why SAM application test jobs are running by sgm user on some sites (146) - 21/04/09 - Vladimir,Joel - SAM SW installation logic by synchronizing shared areas with the CS SW specification. Should be complemented with the installed SW monitoring tools. (147) - 21/04/09 - Joel - renew the request to IT for deployment of the new LHCb/DIRAC central host machine (148) - 21/04/09 - Joel - setup DIRAC SVN/Trac project portal and configure access to the DIRAC developer team. (149) - 05/05/09 - Ricardo,Andrew - test the --use-grid SetupProject option to set the LFC_HOST to be used by CORAL with Merging jobs
    • 10:10 → 10:25
      Production status report 15m
      - Report from the Production meeting - v4r14 DIRAC release - WorkflowLib release - MC'09
    • 10:25 → 10:55
      DIRAC tasks 30m
      - Infrastructure monitoring (SAM,SLS,Dashboard) - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 10:55 → 11:05
      AOB 10m