Main goal: discuss and document the MP3 experience of this HWC campaign, and to see how we can optimise future HWC campaigns.
Equally important is to discuss if re-commissioning steps are needed after technical/Xmas stops, and how additional monitoring and automatic analysis can improve the safe operation of the magnet circuits during run 2.
09:00
→
09:15
Introduction: Main goal of this review15m
Speaker:
Arjan Verweij(CERN)
Slides
09:15
→
10:00
MP3 organisation45m
Speakers:
Ivan Romera Ramirez(CERN), Jean-Philippe Tock(CERN)