Description
After a brief description of the functionalities of a DFB for the magnets powering, the strategy of
transport, installation, commissioning and testing will be presented. The information that could
be obtained from the test in SM18 of the first DFB will be explained together with the possible
modification/consolidation to be performed during installation. The impact of DFB failures and
availability on beam commissioning will also be presented together with the requirement and
impact of in-situ repair and/or exchange and related downtime of the machine. Control
requirements will be listed.