Beam instrumentation other than BLMs linked to the machine protection system

20 Jan 2005, 16:40
20m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map
oral Machine Protection Issues affecting Beam Commissioning Session 8 - Machine Protection Issues affecting Beam Commissioning

Speaker

Dr Rhodri Jones (CERN)

Description

The beam loss monitoring system will be the main instrument charged with detecting and acting upon the majority of failures that could lead to quenches or damage. In a few cases, however, additional instrumentation is required to protect the machine. Three such systems will be discussed along with their proposed implementation,namely: the beam dump channel position interlock in IR6, a fast orbit drift interlock and a fast loss interlock using beam current transformers. For many types of failures these systems would also be a back-up to beam loss monitoring thus inceasing the overall reliability of the machine protection system.

Primary author

Dr Rhodri Jones (CERN)