Machine checkout and setup periods

17 Jan 2005, 14:15
15m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map
oral Scheduling LHC Operation Session 2 - Scheduling LHC Operation

Speaker

Dr Jan Uythoven (CERN)

Description

Before the first LHC beam operation and following the LHC hardware commissioning a cold checkout period is required to check the simultaneous functioning of the various LHC subsystem in their final configuration. Following this cold checkout period a set-up period with beam is required to verify the proper operation of all equipment, including the machine protection system, with beam. The tests required in both phases and the estimated overall time necessary to perform these tests is described. The same estimate is also made for the subsequent years of LHC operation.