Speaker
Mr
J. Ridewood
Description
A summary of the general service requirements for a large warm
dipole magnet and the challenges and issues associated with their
installation will be presented. The LHCb spectrometer magnet will be
used as an example, covering principally the power supply, cabling
and cooling water system from conception to realisation and
commissioning.
Author
Mr
J. Ridewood