Control room operation of the Technical Infrastructure under the responsibility of
the Technical Support Department (TS) was carried out for decades based on the
round-the-clock operation from the Technical Control Room (TCR). The TCR functions
and services have been integrated in the AB Department in January 2005 and will
finally be assumed by the CERN Control Centre (CCC) in the beginning of 2006. The CCC
will be in charge of beam, cryogenic and the Technical Infrastructure Operation for
the LHC and its injectors. A well functioning operation and maintenance of the
Technical Infrastructure will continue relying on the quality of control room
services. The TS expectations of CCC operation are outlined in this paper, which
shall result in a well-defined operational framework, for both the equipment groups
and the control room team.