24–26 May 2005
Archamps
Europe/Zurich timezone

TECHNICAL INFRASTRUCTURE MONITORING FROM THE CCC

24 May 2005, 15:20
20m
JURA building (Archamps)

JURA building

Archamps

Site d'Archamps F-74160 Archamps
Presentation LHC Installation, comissioning and operation from CCC Session 3

Speakers

Mr J. StowisekMr S. Roy

Description

In the summer of 2005, the Technical Infrastructure Monitoring (TIM) system will replace the Technical Data Server (TDS) as the monitoring system of CERN’s technical services. Whereas the TDS was designed for the LEP, TIM will have to cope with the much more extensive monitoring needs of the LHC era. To cater for this, the new system has been built on industry-standard hardware and software components, using Java 2 Enterprise Edition (J2EE) technology to create a highly available, reliable, scalable and flexible control system. A first version of TIM providing the essential functionality will be deployed in the MCR in June 2005. Additional functionality and more sophisticated tools for system maintenance will be ready before the start-up of the LHC in 2007, when CERN’s technical infrastructure will be monitored from the future CERN Control Centre.

Authors

Presentation materials