Session 8: Core activities

  • T. Pettersson (TS-CSE)

Presentation materials

There are no materials yet.

  1. Mrs E. Sanchez-Corral, Mr S. Petit
    25/05/2005, 16:10
    Core
    Presentation
    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas...
    Go to contribution page
  2. Mr P. Martel
    25/05/2005, 16:30
    Core
    Presentation
    In this document are presented some of the new functionalities available in the new release of Datastream 7i. The features now available can substantially improve the performance of the system as well as reduce the overall administrative load to manage work orders. A brief overview of how the lifecycle of an equipment is handled in the Datastream 7i is given as well as a comment on the...
    Go to contribution page
  3. Mr M. Battistin
    25/05/2005, 16:50
    Special technologies
    Presentation
    Computational Fluid Dynamics (CFD) is an analysis of fluid flow, heat transfer and associated phenomena in physical systems using computers. CFD has been used at CERN since 1993 by the TS-CV group, to solve thermo-fluid related problems, particularly during the development, design and construction phases of the LHC experiments. Computer models based on CFD techniques can be employed to...
    Go to contribution page
  4. Ms A. Funken
    25/05/2005, 17:10
    Core
    Presentation
    Au milieu de l’année 1999, le projet de renforcement des infrastructures techniques du Centre de Calcul a été lancé afin de répondre aux besoins des Fermes de Calculs destinées au traitement et stockage des données des expériences du LHC. En 2008, première année de fonctionnement du LHC à pleine luminosité, les Fermes de Calculs devraient occuper 2500 m2 et consommer une puissance...
    Go to contribution page
  5. Ms N. Bangert
    25/05/2005, 17:30
    Core
    Presentation
    In the fight against the Legionnaires’ disease, the proper maintenance of cooling towers is an important issue. Legal requirements concerning the correct maintenance and analysis have only been recently defined by the French law. These reinforce the recommendations issued by the French ministry in June 2001. The main activities to be taken care of in the operation and maintenance...
    Go to contribution page
  6. Mr P. Minginette (CERN)
    25/05/2005, 17:50
    Core
    Presentation
    Au cours du long shutdown de 2005, les aimants PS vont entamer une cure de jouvence pour être en mesure de répondre aux besoins du LHC. Ainsi la moitié des dipôles du PS, 50 éléments sur 100, seront déplacés, rénovés et réinstallés en 2005. Compte tenu de l’augmentation significative des cadences de manutention (un aimant par semaine par rapport à un aimant par mois en période de shutdown...