Speaker
Dr
Peter Ladd
(ORNL)
Description
An overview of the installation of the SCL warm sections at the Spallation
Neutron Source (SNS) is presented as the project proceeds on schedule to beam
on target planned for mid 2006. Specifically addressed are the procedures
adopted during the assembly and installation of the warm sections needed to
maintain the cleanliness levels required as they are connected to the
superconducting cavities
Author
Dr
Peter Ladd
(ORNL)