  1. Joao Varela (LIP)
    07/04/2005, 08:30
    Workshop description and goals.
    Go to contribution page
  2. Tiziano Camporesi
    07/04/2005, 08:40
    State of the art of the different ECAL experimental areas:

    867, H4 & MT

    Go to contribution page
  3. Jordan Nash (CERN)
    07/04/2005, 09:00
  4. Kostas Kloukinas (CERN)
    07/04/2005, 09:15
    The CCS will present the hardware test and commissioning plans (including timetable if possible). It will also present the detailed list of auxiliary components needed: #crates, #bus adapters, PC's, etc. Out of those lists we will elaborate a single list with the requirements in terms of auxiliary equipment.
    Go to contribution page
  5. Jose Carlos Rasteiro Da Silva (LIP)
    07/04/2005, 09:40
    The DCC will present the hardware test and commissioning plans (including timetable if possible). It will also present the detailed list of auxiliary components needed: #crates, #bus adapters, PC's, etc. Out of those lists we will elaborate a single list with the requirements in terms of auxiliary equipment.
    Go to contribution page
  6. Yannick Geerebaert (LLR)
    07/04/2005, 10:05
    The TCC will present the hardware test and commissioning plans (including timetable if possible). It will also present the detailed list of auxiliary components needed: #crates, #bus adapters, PC's, etc. Out of those lists we will elaborate a single list with the requirements in terms of auxiliary equipment.
    Go to contribution page
  7. Joao Varela (LIP)
    07/04/2005, 11:00
    A review of the TTC system (hardware and software) will be presented for the different experimental areas, the Laser Monitoring and the final system.
    Go to contribution page
  8. Eugueni Vlassov (CERN)
    07/04/2005, 11:50
    CCS software requirements for EIC. CCS will present its debugging tools (CCS gui) and its monitoring needs. If common tools for System Test Control are needed, the CCS will present its interface to it. Together we should agree/elaborate the needs for a common tool for System Test Control (ECAL Supervisor and test control GUI).
    Go to contribution page
  9. Nuno Almeida (LIP)
    07/04/2005, 12:05
    DCC and SLB software requirements for EIC. DCC and SLB will present its debugging tools (ex. DCC gui) and its monitoring needs. If common tools for System Test Control are needed, the DCC/SLB will present its interface to it. Together we should agree/elaborate the needs for a common tool for System Test Control (ECAL Supervisor and test control GUI).
    Go to contribution page
  10. Pascal Paganini (LLR,CNRS/IN2P3)
    07/04/2005, 12:20
    TCC software requirements for EIC. TCC will present its debugging tools (TCC gui) and its monitoring needs. If common tools for System Test Control are needed, the TCC will present its interface to it. Together we should agree/elaborate the needs for a common tool for System Test Control (ECAL Supervisor and test control GUI).
    Go to contribution page
  11. Francesca Cavallari (Rome University)
    07/04/2005, 14:30
    The current status of the ECAL conditions database and how a novice user should use it, will be presented.
    Go to contribution page
  12. Reyes Alemany (LIP)
    07/04/2005, 14:50

    A propossal for the ECAL Configuration database will be presented. In particular the "Partition Configuration" and the "Run Type" configuration of the system. During this talk the Equipment Management database will be revised.

    Go to contribution page
  13. Eugueni Vlassov (CERN)
    07/04/2005, 15:10

    CCS will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.

    CCS should also answer the question: which CCS data will be in conditions database?

    Go to contribution page
  14. Nuno Almeida (LIP)
    07/04/2005, 15:30

    DCC will present its configuration database (status and prospects) and the requirements to the Generic Device Configurator, if any.

    DCC should also answer the question: which DCC data will be in conditions database?

    Go to contribution page
  15. Pascal Paganini (LLR,CNRS/IN2P3)
    07/04/2005, 16:20

    TCC will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.

    TCC should also answer the question: which TCC data will be in conditions database?

    Go to contribution page
  16. Irakli Mandjavidze (DAPNIA, CEA Saclay)
    07/04/2005, 16:40

    SRP will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.

    SRP should also answer the question: which SRP data will be in conditions database?

    Go to contribution page
  17. Reyes Alemany (LIP)
    08/04/2005, 08:30

    A proposal for the software architecture of the final system will be presented. Then we will discuss if it is adequated and fulfills the needs of the different devices including SRP system (for which a dedicated talk is forseen to understand its requirements) and DCC- PreShower.

    Go to contribution page
  18. Irakli Mandjavidze (DAPNIA, CEA Saclay)
    08/04/2005, 09:00

    What are the SRP software needs in view of the final system. How can be integrated with the rest of the devices.

    Go to contribution page
  19. Patrice Verrecchia (DAPNIA, CEA Saclay)
    08/04/2005, 11:00

    During this session the following items will be presented:

    • hardware infrastructure;
    • software infrastructure (integration with the other modules);
    • DB requirements (EMDB, Configuration and Conditions), at the different experimental areas and for the final system;
    • definition of interfaces to the readout and trigger systems
    Go to contribution page
  20. Irakli Mandjavidze (DAPNIA, CEA Saclay), Philippe Gras (DAPNIA, CEA Saclay)
    08/04/2005, 14:30
    SRP system: status and test plans will be discussed here since software and DB issues are discussed in other sessions. An important question should be answer during this workshop: how is going to take place the "integral test" of the SRP system after installation in USC5 and without external triggers.
    Go to contribution page
  21. Jean Louis Faure
    08/04/2005, 17:00
    Hardware and software work organization (# Racks, # Crates, #Bus adapters, etc needed; DCC-T & TCC-T), software strategies for the different experimental areas.
    Go to contribution page
  22. Philippe Busson (LLR,CNRS/IN2P3)
    08/04/2005, 17:45