A propossal for the ECAL Configuration database will be presented. In particular the "Partition Configuration" and the "Run Type" configuration of the system. During this talk the Equipment Management database will be revised.
CCS will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.
CCS should also answer the question: which CCS data will be in conditions database?
DCC will present its configuration database (status and prospects) and the requirements to the Generic Device Configurator, if any.
DCC should also answer the question: which DCC data will be in conditions database?
TCC will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.
TCC should also answer the question: which TCC data will be in conditions database?
SRP will present its configuration database (status and prospects), and the requirements to the Generic Device Configurator, if any.
SRP should also answer the question: which SRP data will be in conditions database?
A proposal for the software architecture of the final system will be presented. Then we will discuss if it is adequated and fulfills the needs of the different devices including SRP system (for which a dedicated talk is forseen to understand its requirements) and DCC- PreShower.
What are the SRP software needs in view of the final system. How can be integrated with the rest of the devices.
During this session the following items will be presented:
- hardware infrastructure;
- software infrastructure (integration with the other modules);
- DB requirements (EMDB, Configuration and Conditions), at the different experimental areas and for the final system;
- definition of interfaces to the readout and trigger systems