-
Electronics Integration Centre (904)
- Overview of the ECAL activities at EIC.
- Hardware test and commissioning plans: CCS,DCC and TCC.
- Software requirements: CCS,DCC and TCC.
-
TTC system and test synchronization
A review of the TTC system (hardware and software) will be presented
for the different experimental areas, the Monitoring farm (laser and pedestals) and
the final system. -
Off-Detector Electronics database
- Equipment Management DB
- Configuration DB
- Conditions DB
-
Software architecture (in view of the final system).
DCC, TCC, CCS and SRP software architecture/integration.
-
Monitoring Farm (Laser & Pedestals)
Monitoring Farm (at the different experimental areas and for the final system): software, hardware and DB requirements. Interfaces to the readout and trigger systems.
-
SRP system
Status and test plans.
Choose timezone
Your profile timezone: