EGEE-SA1-SWE Meeting

→ Europe/Zurich
Motorcycle VRVS Virtual Room (http://www.vrvs.org)

Motorcycle VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Apologies: Pepe Salt (IFIC), Ricardi Graciani (UB)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * Javi Fontan reporting. * Power outage last friday. Recovering from it. * Some LFN files cannot be reached.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        * Javi Calonge reporting. * Next week planned upgrade to scientific linux. Offline status expected all next week. Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 28/03/05 to 01/04/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? 11-04 to 15-04 By when will the WNs in the Site be upgraded? 11-04 to 15-04 Along next week we will be running Service Security Challenge 1 , so previous scheduled date to upgrade have had to be postponed. We will schedule a site downtime to the week after (tentatively, April 11-15)
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * Everything seems ok from CNB.
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        * Dani Cano reporting. * Some networking problems since last week. Schedulled downtime until solved. Symptoms are that sometimes the network is not working (ping fails for example).
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Monitoring tests look ok for IFIC.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        * Kai Neuffer reporting. * Problems with storage element as disk was full with atlas files. * Problem with Appel now solved. Weekly Operations Status Report: [INTA-CAB] Reporting Period: [28/03/05] to [03/04/05] Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== * Total days unavailable 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days * Scheduled Maintenance During the Next Reporting Period 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ SE (se00) harddisk was full which caused replica test failures. We changed the disk to a bigger one and we are thinking of reserving an area on the disk for dteam or activate quotas. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Neuffer, Kai
      • LIP-LCG2 15m
        * Mario David reporting. * Network Bandwidth saturation problems due to Atlas activities. Working to avoid the risk of saturation by changing where different nodes are connected. Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt [OK] LCG-BDII: ii02.lip.pt [OK] RLS: se01.lip.pt [OK] Non-Functional Time ==================== [CT] failed on 2005-03-30 GFAL infosys [CT] failed on 2005-04-01 GFAL infosys + 3rd Party Rep. castorgrid to defaultSE 2 half days Scheduled Down Time =================== No Scheduled Down Time Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC303 Points to Raise at the Operations Meeting ========================================= Network measurement is being done Sites already performing measurements LIP CESGA Improvement of the web pages ongoing
        Speaker: David, Mario
      • IFAE 15m
        * Carlos Borrego reporting. * Problems with NFS server now ok. * Problem with the MON machine with Tomcat hanging. Solved by Carlos by modifying the startup script. Reported to savannah, status of the bug is open. Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 28/03/05 ] to [ 01/04/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: lcgce02.ifae.es,lcgbdii02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Due to a yaim re-configuration we had GlueCEPolicyMaxWallClockTime re-defined and set to 0. Tests jobs were not able to run. - vo's software directories were unreachable for some period. We had a problem with our nfs server. Problem is solved - lcgrb02.ifae.es was unreachable for 1 day (monday) Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? April By when will the WNs in the Site be upgraded? April Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • PIC 15m
        * Carlos Borrego reporting. * Last week problems with monitoring. Incorrect values were published and test failed. * Problems with NFS server now ok. Weekly Operations Status Report: [ PIC ] Reporting Period: [ 28/03/05 ] to [ 01/04/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Due to a yaim re-configuration we had GlueCEPolicyMaxWallClockTime re-defined and set to 0. Tests jobs were not able to run. - vo's software directories were unreachable for some period. We had a problem with our nfs server. Problem is solved - tomcat makes rb01.ifae.es hang. I had to comment some lines in the startup file in order to make it work properly Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 18/03/05 ] to [ 01/04/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== none Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= delay !!!!!!!!!!!!!! By when will all service nodes in the Site be upgraded? [ April ] By when will the WNs in the Site be upgraded? [ April ] Points to Raise at the Operations Meeting ========================================= none <comments> - now, RB and BDII are two diferent machines - I am installing a DCACHE SE
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting. * Power outage during the weekend (Sunday evening). Weekly Operations Status Report: UB Reporting Period: 28/03/2005 to 03/04/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== Since Sunday evening the site has been unreachable from the WAN due to a power cut affecting the some of the networking equipment. Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ See above. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? By when will the WNs in the Site be upgraded? (together with update to 2.4.0) PS: I will not be able to attend the meeting today.
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        * Reported by mail. Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 14/03/05 ] to [ 01/04/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es [OK] Non-Functional Time ==================== - Total days unavailable: 7 days 28-03-2005 - CT -> Number of files in quota exceeded of user dteam. 29-03-2005 - JS -> Number of files in quota exceeded of user dteam. 30-03-2005 - CT -> Problem with the MDS service in the SE. 18-03-2005 - 21-03-2005 - JS -> Problem with the jobmanager-lcgpbs Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 days. * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        * Fco Bernabe reporting.
        Speaker: Saborido, Juan Jose
      • Savannah EGEE SA1 SWE open tickets for sites 15m
        Mario David reporting. No open issues in savannah. GGUS has 3 open tickets for INTA, PIC and UPV. They seem under control.
        Speaker: David, Mario
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      * Mario Dabid has installed the new version of Apel and it seems that everything is fine. No reprocessing of the records was necessary after the upgrade. APEL STATUS REPORT == Period == From March 26 to April 1 == Summary == March 31 Flexible Archiver has been down. This avoids publishing accounting data during these days even if Apel is working fine in some sites. During this week, LIP has installed the new version of Apel. It seems to work properly because they have avoid the problem of the Flexible Archiver and have published data all days. So they will not need to reprocess their data. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: 31 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None 14/11/04 Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: From 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: None Site: IFIC Solved Problems of Last Report: NO Missing Accounting Entries: 31 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: INTA Solved Problems of Last Report: Yes. Missing Accounting Entries: 31 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: NO Missing Accounting Entries: 31 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: 31 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: 30, 31 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None Site: USC Solved Problems of Last Report: NO Missing Accounting Entries: Since 22/03/05 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Network Monitoring deployment 15m VRVS

      VRVS

      * LIP and CESGA have deployed the tools and measurements are being published. * It seems to work. All sites are expected to install the tool and open the firewall. * Croscheck is necessary to take the values as correct.
      Speaker: David, Mario (LIP)
    • 12:20 → 12:35
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        * The execution plan will be reviewed in March. This action is postponed until then.
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CIEMAT, CNB, IFIC, IFAE, UAM and USC to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.2.21.1 Andreu Pacheco to propose in the ROC Managers meeting to decentralize monitoring tests (OPEN) 15m
        * Tests are done each hour from CESGA site. They can be seen from the web page: http://wn002.egee.cesga.es/cgi-bin/lastreport.cgi
        Speaker: Pacheco, Andreu (PIC)
      • 5.3.7.1 Miguel Cardenas to check if forensic analysis after intrusion is mandatory and who can do it (NEW) 15m
        About the question, is it compulsory to make fosensic analysis in the EGEE? The answer at this moment is not, following the "Grid Security Incident Handling and Response Guide" from the "Operational Security Coordination Team" (OSCT), and the comment of David Kelsey and Ian Nelson. The reason for avoid establish the analysis mandatory are that, perhaps, making it compulsory could even discourage small sites. However, from the OSCT, it should strongly encourage to people to perform analysis forensic. In other hand, there is not a deontological code for the use of data received in this issue. So, Elio Perez and me have written a draft of this code. We add this draft to the message. Deontological Code for the use of image of compromised computers: - Collected data will not be modified by the analysis team. Any work will be developed using copies. - Collected data will be used only by the analysis team. Nobody else should access to this information. - The analysis team will guarantee the confidentality of any information stored on disks. - Collected data should be used only for research porpouses. Once the investigation has concluded, any information keeped by the analysis team should be destroyed. - In case the analysis becomes useful for research or educational porpouses, only technical information should be used, avoiding any usage of user data. We hear any suggestion about this draft. * We close this ticket and we open new ones: legal implications of forensic analysis, the formal approval of the deontologic code and the steps to add Miguel Cardenas as SWE Security officer
        Speaker: Cardenas, Miguel (CIEMAT)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        Hello everybody: As we promised in the last our weekly meeting the standalone SWE Ticketing System is ready to be tested. The system can be reached using the following URL: http://cg1.ific.uv.es/tstdesk/index.php. There I have included the list of both the supporter names and the supporter groups names that we sent to me 6 weeks ago, as well as all the changes needed to integrated it to the GGUS one. There is another test ticketing system that is been using for the integration purpose, and it has the same adaptation structure that the one which I am sending to you. To access to the standalone system, one must have an account there, therefore I have created several accounts for all the experts that I have received from you. Below I will list the login/passwor for each one. Once you log into the system you can change your password using the "Edit Profile" option located in the left-hand on the web page. If someone is not appear in the list below, please feel free either to register for an account (using the above URL) or to send to me an e-mail. The system now has only the experts, and to test the whole system in order to provide us a good feedback it is useful to have some normal users. These users will create the ticket, that next will be answerd by the experts. So all the peaple in this mailing list are invited to ask for an account either as an expert or as a normal user. * Next actions. We must test the system prior to make it operative and Mohammed must make operative the ticket import/export to GGUS.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (NEW) 15m
        * Mario has volunteered to test some Crossgrid monitoring tools to evaluate their deployment in EGEE-SWE. * Netowrk Monitoring and measurement is being tested at LIP. * The Central Monitoring Host (CMH) is being configured a client will be deployed with the sensors (ce01) for a first test. * After this more news will be sent to the SWE for deployment in the other sites
        Speaker: David, Mario (LIP)