EGEE-SA1-SWE Meeting

→ Europe/Zurich
Sky VRVS Virtual Room (http://www.vrvs.org)

Sky VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (PIC), Gonzalo Merino (PIC), Kai Neuffer (INTA), Eduardo Huedo (INTA), Carlos Borrego (PIC), Celso Martinez (IFCA), Alvaro Fernandez (IFIC), Dani Cano (IFCA), Pablo Rey (CESGA), Javi Fontan (CESGA), Mario David (LIP), Marc Rodriguez (PIC), Carlos fernandez (CESGA), Javi Lopez (CESGA), Fco. Bernabe (CESGA)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      more information
      • CESGA-EGEE 15m
        Javi Fontan reporting.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Reported by mail. Currently in schedulled downtime. They want to upgrade to LCG 2.4 Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 04/04/05 to 08/04/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period Downtime from 11/04/2005 10:00 to 15/04/2005 18:00 for upgrade to LCG-2.4.0 (and some hardware reorganization) Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? 11-04 to 15-04 By when will the WNs in the Site be upgraded? 11-04 to 15-04
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        No report
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        Reported by Celso. Cluster in downtime last week due to a DHCP problem. Now installing LCG 2.4 and also in downtime. Problem with the Spanish CRL which expired todays.
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        Alvaro Fernandez reporting. Running LCG 2.3.1. Last night there was a problem with the Castor SRM currently solved by Javi. Planning to upgrade to LCG 2.4.0 + Scientific Linux soon. No date yet, probably next week.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Kai reporting. Upgrade to LCG 2.4 Tuesday 12-Wed 13th April. Weekly Operations Status Report: INTA-CAB Reporting Period: 04/04/05 to 08/04/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 1 days (LCG-2_4_0 upgrade and validation). Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        * Mario reporting. * Upgraded to LCG 2.4 with some problems.
        Speaker: David, Mario
      • IFAE 15m
        Carlos Borrego reporting. We had to restart all the nodes due to NFS problems. We were down for 1 or two days. Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 04/04/05 ] to [ 08/04/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: lcgce02.ifae.es,lcgbdii02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 1 day Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ We had a serious problem regarding nfs. Software directories and home directories were unavailable. WNs hanged. We were force to reboot the whole cluster. Apparently the problem is solved. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? April By when will the WNs in the Site be upgraded? April Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • PIC 15m
        Carlos Borrego reporting. We had to restart all the nodes due to NFS problems. We were down for 1 or two days. Weekly Operations Status Report: [ PIC ] Reporting Period: [ 04/04/05 ] to [ 08/04/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 1 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ We had a serious problem regarding nfs. Software directories and home directories were unavailable. WNs hanged. We were force to reboot the whole cluster. Apparently the problem is solved. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Reported by mail. Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 02/03/05 ] to [ 08/04/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== 1 day: Problem with pbs server /opt/edg/libexec/ceinfo-wrapper.sh failed. Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= delay !!!!!!!!!!!!!! By when will all service nodes in the Site be upgraded? [ April ] By when will the WNs in the Site be upgraded? [ April ] Points to Raise at the Operations Meeting ========================================= none <comments> - now, RB and BDII are two diferent machines - I am installing a DCACHE SE
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        No report.
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Reported by mail. Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 04/04/05 ] to [ 08/04/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 days. * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Manuel Sanchez reporting. Weekly Operations Status Report: USC Reporting Period: 01/03/2005 to 08/03/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ Monitoring jobs don't reach the site, but that seems to be the situation for all Europe according to the monitoring map. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there
        Speaker: Sanchez, Manuel
      • GGUS EGEE SA1 SWE open tickets for sites 15m
        Reported from Mario. * Only two new tickets open with minor problems. As there are major problems with the CERN resource broker no easy to track down. Gonzalo Merino: The GGUS web site it is not user-friendly to find the tickets open for a site. Mario: Not clear how tickets are handled. We should clarify better the use of GGUS by somebody. Andreu: Is there a way to know the tickets open in SWE? Mario: We get the email that the ticket is open and we keep the list in the mail inbox. Open Tickets: https://gus.fzk.de/pages/ticket_details.php?ticket=2019 https://gus.fzk.de/pages/ticket_details.php?ticket=2040
        Speaker: David, Mario (LIP)
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      Pablo Rey reporting. Several sites have updated the version of Apel. The new version of Apel will be included in LCG 2.4 so there is no need to update manually. All sites should check the installation notes because of the differences of the versions. APEL STATUS REPORT == Period == From April 2 to April 8 == Summary == April 6 and 8 Flexible Archiver has been down. This avoids publishing accounting data during these days even if Apel is working fine in some sites. During this week, at least CIEMAT, INTA and UPV have installed the new version of Apel. It seems to work properly because they have avoid the problem of the Flexible Archiver and have published data all days. So they will not need to reprocess their data. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: April 2 and 3 their machines has been down. Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have installed the new version of Apel this week Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: 6, 8 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: From 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: None Site: IFIC Solved Problems of Last Report: NO Missing Accounting Entries: 6, 8 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: INTA Solved Problems of Last Report: Yes. Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have installed the new version of Apel this week Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have installed the new version of Apel. April 3 their machines has been down. Since April 6 they are in maintenance Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: 6, 8 Publishing User Name Information: Yes Actions: None Other Comments: None Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: They have published the data of the missing days of the last week but they have not solved the problems of the previous weeks. Missing Accounting Entries: 8 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: 8 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have installed the new version of Apel this week Site: USC Solved Problems of Last Report: NO Missing Accounting Entries: Since 22/03/05 Publishing User Name Information: Yes Actions: JoinProcessor Reprocess Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:45
      gLite Deployment Plans and Status 30m VRVS

      VRVS

      Javi Lopez reporting. It will be worth to comment what is the current status after the release of gLite 1.0 and the plans from now on. As said last week the people in the certification group are solving errors in the installation scrips now being solved. It seems that the new release is more stable. The only site running jobs is the development cluster at CERN. The preproduction will start in one or two weeks after the gLite will be declared as stable. The first site will be the test development cluster. The idea is to have 4 extra sites in the preproduction: CERN, NIKEF, RAL and PIC. Later more sites will be added. Sites interested: LIP, INTA, IFIC, and CESGA.
      Speaker: Lopez, javier (CESGA)
    • 12:20 → 12:35
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        * The execution plan will be reviewed in March. This action is postponed until then.
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CIEMAT, CNB, IFIC, IFAE, UAM and USC to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.1 Miguel Cardenas to check if forensic analysis after intrusion is mandatory and who can do it (NEW) 15m
        Speaker: Cardenas, Miguel (CIEMAT)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        Mohammed Kaci reporting. Testing of the SWE-GGUS ticket exchange: He is sending the tickets from the SWE ticket system to GGUS but he does not see them there. Tickets were imported from GGUS but they could not be saved due to a database problem. Italy ROC has abandonned OneorZero. New system looks much more flexible.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
    • 12:25 → 12:40
      Expiration of the CRL of the Spanish CA 15m VRVS

      VRVS

      It looks there was a problem with the last spanish crl update, (an old crl was used instead of the last one), if needed please update asap: /opt/edg/etc/cron/edg-fetch-crl-cron (if you wait until next update crl may be expired for some hours)
      Speaker: Marco, Rafa (IFCA)