EGEE-SA1-SWE Meeting

→ Europe/Zurich
Pacheco, Andreu
Description
This meeting has been postponed due to the EGEE3 conference in Athens. http://public.eu-egee.org/conferences/3rd/programme/outline.html
    • 12:00 → 12:10
      Briefing of activities 10m VRVS

      VRVS

      Speaker: Pacheco, Andreu (PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 04/04/05 to 08/04/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period Downtime from 11/04/2005 10:00 to 15/04/2005 18:00 for upgrade to LCG-2.4.0 * Scheduled Maintenance During the Next Reporting Period We will still be in downtime until 21/04/2005 Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Now till 21/04 By when will the WNs in the Site be upgraded? Now till 21/04 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 11/04/05 to 15/04/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 1.5 days (LCG-2_4_0 upgrade and validation). * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ R-GMA and Apel problems after upgrade. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 09/04/05 to 15/04/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt RLS: se01.lip.pt LFC: se01.lip.pt Non-Functional Time ==================== [CT] Failed from 2005-04-09 to 2005-04-11 [JS] Failed 2005-04-17 queues were full with atlas jobs job submission SFT through the RB failed. Site was OK for ATLAS [OK] 2 days Scheduled Down Time =================== [SD] 2005-04-11 to 2005-04-14 GOC downtime: Operations in the SE Major Operational Issues Encountered During the Reporting Period ================================================================ SFT failure due to the queues being full with ATLAS jobs job submission through the RB Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC304 Points to Raise at the Operations Meeting ========================================= LFC has ben deployed for "swetest", "atlas" and "cms" VO's Its up and running OK, at least until someone complains!! All SWE sites should move fast to use the LFC, the swetest catalog was migrated from RLS to LFC. Network measurement is being done Sites already performing measurements LIP CESGA Improvement of the web pages ongoing (have taken to second priority).
        Speaker: David, Mario
      • IFAE 15m
        Speaker: Borrego, Carlos
      • PIC 15m
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 11/04/05 ] to [ 15/04/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es [OK] Non-Functional Time ==================== - Total days unavailable: 2 days 13-04-2005 & 14-04-2005 -> Hardware malfunction in shared disk machine (/home directory). (13-04-2005 -> The GOC GIIS says state SD, but it should be JS) Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0.5 days. 12/04/05 15:00:00 - 17:00:00 -> Move the RB & SE node to a new location * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Hi Gonzalo, Weekly Operations Status Report: USC Reporting Period: 09/04/2005 to 15/04/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ Monitoring jobs don't reach the site, but that seems to be the situation for all Europe according to the monitoring map. Upgrade to LCG 2.4.0 ============================================= April 2005
        Speaker: Sanchez, Manuel
      • GGUS EGEE SA1 SWE open tickets for sites 15m
        Speaker: David, Mario (LIP)
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From April 9 to April 15 == Summary == April 9, 10, 11, 12 and 13 Flexible Archiver has been down. This avoids publishing accounting data during these days even if Apel is working fine in some sites. During this week, several sites have been in maintenance to update to LCG2.4.0. By other hand, taking into account the received monitoring alerts, other sites have had problems with their machines. Therefore this week almost all sites have had some problem to publish their accounting data. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None. Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: NO. April 15 have not published the user name. Actions: Check the configuration of Apel: They are reprocessing their data and they are not publishing user name. Other Comments: They have installed LCG2.4.0 during this week and probably they have rewritten the configuration of Apel. Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: None Site: IFIC Solved Problems of Last Report: NO Missing Accounting Entries: 9, 10 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: INTA Solved Problems of Last Report: Yes. Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: None. They have installed the new version of Apel so they should publish the old data the next time that Apel work. Other Comments: They have updated to LCG2.4.0 so they should check the configuration of Apel before run it. Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: None. They have installed the new version of Apel so they should publish the old data the next time that Apel work. Other Comments: They have updated to LCG2.4.0 so they should check the configuration of Apel before run it. Site: pic Solved Problems of Last Report: NO Missing Accounting Entries: 13, 14, 15 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: NO Missing Accounting Entries: 9 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: UB Solved Problems of Last Report: NO Missing Accounting Entries: 9, 15 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: 14, 15 Publishing User Name Information: Yes Actions: None. They have installed the new version of Apel so they should publish the old data the next time that Apel work. Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)