Compatibility of Hardware Commissioning with Installation: Experiments

13 May 2005, 09:35
15m
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Speaker

Daniela Macina (TS-LEA)

Description

The installation of the experimental areas will be briefly reviewed with particular attention paid to the installation of the radiation shielding and vacuum beam pipes which may interfere with the Hardware Commissioning of the magnets located close by (low beta triplets and compensator magnets). The LHCb detector installation and the Hardware Commissioning of the Cryogenic equipment located in the UX85 cavern will be mentioned too. Issues related to the access system connecting the machine and experimental underground areas will be addressed if any. In addition, the installation of the experimental detectors in the machine tunnel, i.e. Roman Pots and Zero Degree Calorimeters, will be briefly discussed. Finally, the coordination between the Hardware Commissioning and the Experiments Installation will be clarified.

Author

Presentation materials