EGEE-SA1-SWE Meeting

→ Europe/Zurich
Ocean VRVS Virtual Room (http://www.vrvs.org)

Ocean VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
* Present: Andreu Pacheco (PIC), Pablo Rey (CESGA), Carlos Borrego (PIC), Fco. Jose Bernabe (CESGA), Adria Casajus (UB), Alvaro Fernandez (IFIC), Javier Sanchez (IFIC), Javier Fontan (IFCA), Kay Neuffer (INTA), Eduardo Huedo (INTA), Javier Lopez (CESGA), Mohammed Kaci (IFIC), Jose Salt (IFIC), Carlos Fernandez (CESGA), Dani Cano (IFCA), Carlos Fernandez (CESGA), Rafa Marco (IFCA). * Apologies: Celso Martinez (IFCA)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      more information
      • CESGA-EGEE 15m
        * J. Fontan reporting. * All Ok.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 30/05/05 to 03/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * Some problems reported last week. They were false positives.
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        * Dani Cano reporting. * Still problems with new hardware.
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javier Sanchez reporting. * System stable. * Deploying quattor at IFIC.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 30/05/05 to 3/06/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 28/05/05 to 03/06/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt DOWN RLS: se01.lip.pt LFC: se01.lip.pt Non-Functional Time ==================== [CT] 2005-06-02/03 1.5 days [OK] 5.5 days [CT] failure in GFAL LCG-info: lcg-bdii.cern some error, no information into the lcg-utils, not due to faulty site Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC304 Points to Raise at the Operations Meeting =========================================
        Speaker: David, Mario
      • IFAE 15m
        * Carlos reporting. * In schedulled downtime for migration from RH73 to SCL304. * Problems with castor at the beginning last week. Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 30/05/05 ] to [ 3/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: lcgce02.ifae.es,lcgbdii02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 5 days Scheduled Down Time =================== - Shutdown for reinstalling services on new machines. Major Operational Issues Encountered During the Reporting Period ================================================================ - Problem found with SRM on castorsrm.ifae.es. SRM is closed and lhcb requests are killed. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? - By when will the WNs in the Site be upgraded? - Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • PIC 15m
        * Carlos reporting. * Problems with castor at the beginning last week. Weekly Operations Status Report: [ PIC ] Reporting Period: [ 30/05/05 ] to [ 3/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ce01.pic.es,bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== 07th June 2005 - 09:00 08th June 2005 - 19:00 (Programmed Castor shutdown) Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Non-Functional Time ==================== Friday: Checking the Site Functional Tests (SFT) report at 17:07:02 06/03/05 GMT for your site (UAM), we have found that the status of your site has changed from "OK (OK)" to "Job submission failed (JS)" --> I submit a test and it was oK. I have asked to LCG-ROLLOUT because I do not see a problem. Saturday: Checking the Site Functional Tests (SFT) report at 05:07:02 06/04/05 GMT for your site (UAM), we have found that the status of your site has changed from "Job submission failed (JS)" to "OK (OK)" -->Now it is OK. I have not changed nothing.
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting. * Fresh upgraded.
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 30/05/05 ] to [ 03/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 1 days 01-06-2005 -> Problem with GFAL infosys Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ The problem with the SFT tests reported last weeks return again the day 01-06-2005. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Hi Gonzalo, Weekly Operations Status Report: USC Reporting Period: 02/05/2005 to 09/05/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From May 28 to June 03 == Summary == During this week UB has restarted to publish their accounting data. So now there are 9 (of 13) sites publishing accounting data. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: Since May 9 they are in maintenance Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: NO Missing Accounting Entries: Since 13/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess. Other Comments: They have updated to LCG2.4.0 so they should update to Apel 3.4.44 (or 3.4.45) and check the configuration of Apel before run it. Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: NO Missing Accounting Entries: None Publishing User Name Information: NO. They have now published user data in the last records Actions: Solved Problems of Last Report. Solved Problems with the User Data Other Comments: They have restarted to publish their accounting data Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CIEMAT, CNB, IFIC, IFAE, UAM and USC to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.1 Miguel Cardenas to check if forensic analysis after intrusion is mandatory and who can do it (OPEN) 15m
        Speaker: Cardenas, Miguel (CIEMAT)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        * (6/6/05) Everything is ready. To be deployed in 2 weeks.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        * Carlos reporting. * All services up and running. Most at gLite 1.1
        Speaker: Andres Pacheco (PIC)
        more information
      • CESGA 15m
        * Javi Lopez reporting. * New R-GMA server at gLite 1.1
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Álvaro will contribute to the requested effort for JRA1 gLite testing.
        Speaker: Fernandez, Alvaro (IFIC)