EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (PIC), Javier Lopez (CESGA), Carlos Borrego (PIC), Celso Martinez (IFCA), Kai Neuffer (INTA), Pablo Rey (CESGA), Javier Sanchez (IFIC), Fco. Bernabe (CESGA), Marc Rodriguez (PIC), Adria Casajus (UB).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 03/05/05 to 10/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0.5 days (Friday 10/06/05 19:00 to midnight) * Scheduled Maintenance During the Next Reporting Period 2.5 days (11/06/05 - 13/06/05) Major Operational Issues Encountered During the Reporting Period ================================================================ CIEMAT will be down from Friday afternoon at 19:00 to Monday morning at 10:00 Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        * All up * Dani
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javi reporting. * Yesterday the disk of the RB was full due to Input/Output sandboxes. The data was moved to a bigger disk.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 6/06/05 to 10/06/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0.5 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ Re-establishment of services after electrical power cut. Update of CA RPMs. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Speaker: David, Mario
      • IFAE 15m
        Speaker: Borrego, Carlos
      • PIC 15m
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 04/06/05 ] to [ 10/06/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== SFT --> report at 08:07:02 06/08/05 GMT OK --> report at 06:07:02 06/09/05 GMT Description [GGUS ticket#2919]: + edg-replica-manager -v --vo dteam replicateFile lfn:.grid2n2b1.ft.uam.es.0506081053 -d dcache.gridpp.rl.ac.uk Running command : lcg-rep -v --vo dteam -d dcache.gridpp.rl.ac.uk lfn:.grid2n2b1.ft.uam.es.0506081053 SE type not found lcg_rep: Invalid argument Using grid catalog type: edg + result=1 + set +x There was a problem with dcache.gridpp.rl.ac.uk (SE) The UAM-LCG2 was funtional all time. Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= I am working in a test cluster with SL304 and LCG-2_4_0 By when will all service nodes in the Site be upgraded? [ jun ] By when will the WNs in the Site be upgraded? [ jun ] Installation with QUATTOR (without yaim) I am using a test cluster. Now I have this machines OK : ======== 1 - CE (torque) 1 - SE (SE CLASSIC DISK) 2 - WN 1 - UI 1 - PX 1 - BDII 1 - RB ======== Now, I will install a node MON and a DCACHE SE with quattor Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 06/06/05 ] to [ 10/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 2 days 08-06-2005 -> GFAL infosys server was down (bdii01.pic.es:2170) 09-06-2005 -> Error in the RGMA MON Box, and some problems with 3rd party replication commands Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ The problem with the SFT tests reported last weeks return again the day 01-06-2005. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From Jun 04 to June 10 == Summary == During this week there was no problems with the accounting system and also there was no relevant news related to it: the same sites (9 of 13) remain publishing their accounting data. Regarding the accounting web page, a new feature was added. It is a more complete monthly, quarterly and annual report starting from the month desired (in a PDF file). You can view these reports by choosing the option "PDF Report" of the "REPORTS" menu (http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/). There two types of reports depending of the calculated field showed: CPU time normalized or Total CPU time. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: Since May 9 they are in maintenance Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: June 4, 5 and 6 they were in maintenance, so they didn't publish accounting data Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: NO Missing Accounting Entries: Since 13/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess. Other Comments: They have updated to LCG2.4.0 so they should update to Apel 3.4.44 (or 3.4.45) and check the configuration of Apel before run it. Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CIEMAT, CNB, IFIC, IFAE, UAM and USC to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        * (6/6/05) Everything is ready. To be deployed in 2 weeks.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        * Carlos reporting. * Added VO support for PPS-specific VO's. * Problem with list-mismatch * Upgrading RGMA server to 1.1
        Speaker: Andres Pacheco (PIC)
        more information
      • CESGA 15m
        * Javier lopez reporting. * Updating services. * CE problems solved due to a /etc/hosts problem. * I/O server being installed.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro is preparing the grid course. He will start the work from June 20th.
        Speaker: Fernandez, Alvaro (IFIC)