EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Merino, Gonzalo
Description
Apologies: Andreu Pacheco (PIC)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 11/06/05 to 17/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== 2.5 days (11/06/05 - 13/06/05) Scheduled Down Time (electrical installation maintenance) 0.5 days (16/06/05) Unscheduled shutdown due to a electrical power cut Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 2.5 days (11/06/05 - 13/06/05) * Scheduled Maintenance During the Next Reporting Period 1.0 days (20/06/05 19:00 - 21/06/05 12:00) Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 13/06/05 to 17/06/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= Monday 20th is holiday in Torrejón, so nobody at INTA-CAB will attend the meeting.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Speaker: David, Mario
      • IFAE 15m
        Speaker: Borrego, Carlos
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 13/06/05 ] to [ 19/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ce01.pic.es,bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ - a user from cms submitted more than 700 jobs. cms queue was closed. now is re-opened Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 11/06/05 ] to [ 17/06/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== OK --> ERROR 11:22:39 06/15/05 GMT for your site (UAM) ERROR --> OK 11:38:50 06/15/05 GMT for your site (UAM) TOTAL: 16 min Possible mistake of communication Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= I am working in a test cluster with SL304 and LCG-2_4_0 By when will all service nodes in the Site be upgraded? [ jun ] By when will the WNs in the Site be upgraded? [ jun ] Installation with QUATTOR (without yaim) I am using a test cluster. Now I have this machines OK : ======== 1 - CE (torque) 1 - SE (SE CLASSIC DISK) 2 - WN 1 - UI 1 - PX 1 - BDII 1 - RB 1 - POOL (dcache) ======== Now, I will install a node MON and a DCACHE SE with quattor Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        Hola Gonzalo, Weekly Operations Status Report: UB Reporting Period: 13/06/2005 to 19/06/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Points to Raise at the Operations Meeting ========================================= None
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 13/06/05 ] to [ 17/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From Jun 11 to June 17 == Summary == During this week there were no problems with the accounting system. By other hand, during this week PIC has resumed publishing accounting data. So now there are 10 (of 13) sites publishing accounting data. Only CNB, IFAE and IFCA are not publishing their accounting data (if you need some help with this issue we will be glad to help you) == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 09/04/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: Since May 9 they are in maintenance Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have resumed publishing their accounting data Site: PIC-LCG2 Solved Problems of Last Report: Since 02/03/05 they are publishing user information, but they have not publish the lost user information. They don't reprocess. Missing Accounting Entries: Since 13/03/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: At this moment there are three sites names for PIC: this, pic and ifae. This site name was changed by ifae in the monitoring tools, so will you publish more data with this name?. Could we stop the cheching of this site name? Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CNB, IFIC, IFAE and UAM to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        20/06/2005 update: CIEMAT and USC removed from the list, since they are already running SL on service and worker nodes. IFIC estimates 2 weeks time for setting up quattor and being able to reinstall nodes in SL. IFAE currently in Sched. Downtime. When it will come up again, it will be on SL. UAM and CNB not present in the meeting. Contacted by e-mail.
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        * (6/6/05) Everything is ready. To be deployed in 2 weeks. * (20/6/2005 update) Mohammed: Guenther contacted one week ago requesting information to move the system into producition, and still waiting for the answer. The system is ready. This week will be put in operation.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
        more information
      • CESGA 15m
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        Speaker: Fernandez, Alvaro (IFIC)