EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: A. Pacheco (PIC), P. Rey (CESGA), M. Rodriguez (PIC), J. Sanchez (IFIC), Kai Neuffer (INTA), A. Casajus (UB), J. Lopez (CESGA), Fco. Bernabé (CESGA), D. Cano (IFCA), G. Merino (PIC), M. Cardenas (CIEMAT), C. Borrego (PIC), J.Salt (IFIC), A. Fernandez (IFIC), J. Fontan (CESGA).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * J. Fontan reporting. * Partial power failure in one of the racks (30')
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        * Reported by mail. * Last week there was 1 day downtime for electrical maintenance. Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 18/05/05 to 24/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 1.0 days (20/06/05 19:00 to 21/06/05 12:00) * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * No report.
        Speaker: Merino, Angel
      • IFCA-LCG2 15m
        * Dani Cano reporting * Power failure last week. * Sites IFCA and IFAE out of map because monitoring was disabled in the GOG DB. The cluster seems up and running, but there must be some bdii problem. Since friday (if I remeber well) the goc reports na as status, but there has not been "human intervention" since I recovered them from the power failure and the status was OK. Maybe there is some hidden problem that by now I'm unable to identificate. Cheers Dani ----- Original Message ----- From: Gonzalo Merino <merino@pic.es> Date: Monday, June 27, 2005 9:58 am Subject: IFCA site status > Hello, > > We need to report about the SWE sites status during the last week. > I am a bit confused about the IFCA site status. It does not appear in > the SFT monitoring pages, and according to the GOCDB there is no > Scheduled dowtime currently ongoing. > > Could you please send us some information? > thanks a lot, > Gonzalo (on behalf of SWE ROC) > > -- > Gonzalo Merino (merino@pic.es) > Port d'Informació Científica, PIC > Edifici-D, Universitat Autònoma de Barcelona > 08193 Bellaterra (Barcelona) SPAIN > Tel: +34 93 5813322 / Fax: +34 93 5814110 >
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javi Sanchez reporting. * Some ex-IFIC post-doc has filled the IFIC queues and it is being investigated. It seems that the user has selected the IFIC CE specifically and now the published number of slots is zero.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        * Kai Neuffer reporting. Weekly Operations Status Report: INTA-CAB Reporting Period: 20/06/05 to 24/06/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 20/06/05 to 26/06/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt (problems has to be reinstalled) RLS: se01.lip.pt LFC: se01.lip.pt Non-Functional Time ==================== [JL] 2005-06-24 Job list match failed during about 8 hours [OK] 7 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC304 Points to Raise at the Operations Meeting =========================================
        Speaker: David, Mario
      • IFAE 15m
        * IFAE site is not in the map!
        Speaker: Borrego, Carlos
      • PIC 15m
        * Carlos Borrego reporting. * PIC failed the tests because job overloading. BIOMED jobs starting this morning with thousand of jobs. Weekly Operations Status Report: [ PIC ] Reporting Period: [ 20/06/05 ] to [ 26/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ce01.pic.es,bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 3 days Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ SFT tests haven't passed this week end. We are investigating why. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 18/06/05 ] to [ 24/06/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== at 23-06-2005, we had a problem with globus-mds.I restarted the service. A little time, we did not receive mail of SWE notifications. Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= I am working in a test cluster with SL304 and LCG-2_4_0 By when will all service nodes in the Site be upgraded? [ jun ] By when will the WNs in the Site be upgraded? [ jun ] Installation with QUATTOR (without yaim) I am using a test cluster. Now I have this machines OK : ======== 1 - CE (torque) 1 - SE (SE CLASSIC DISK) 2 - WN 1 - UI 1 - PX 1 - BDII 1 - RB 1 - POOL (dcache) 1 - SE Dcache we will update when the LCG-2_5_0 is OK for Quattor. Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting. Weekly Operations Status Report: UB Reporting Period: 20/06/2005 to 26/06/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Points to Raise at the Operations Meeting ========================================= None
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 20/06/05 ] to [ 24/06/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Hi Gonzalo, Weekly Operations Status Report: USC Reporting Period: 18/06/2005 to 14/06/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From Jun 18 to June 24 == Summary == During this week there were no problems with the accounting system. By other hand, during this week CNB has started to publish their accouting data. Also IFAE has resumed publishing accounting data but they have some problems and they are not publishing their accounting data every day. So now there are 11 (of 13) sites publishing accounting data every day (we are near of 100%). But we can said that ALL the sites of our federation has published their accounting data sometime. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have started to publish their accountint data. Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: 23, 24 Publishing User Name Information: NO. The last published data has not this informatation Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: They have published their lost data but they have some problems with the R-GMA so they can not publish their data every day. Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 15/01/05 Publishing User Name Information: Yes Actions: Solved Problems of Last Report. Reprocess Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        Speaker: Pacheco, Andres (PIC)
      • 5.1.17.7 CNB, IFIC, IFAE and UAM to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        20/06/2005 update: CIEMAT and USC removed from the list, since they are already running SL on service and worker nodes. IFIC estimates 2 weeks time for setting up quattor and being able to reinstall nodes in SL. IFAE currently in Sched. Downtime. When it will come up again, it will be on SL. UAM and CNB not present in the meeting. Contacted by e-mail.
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.2 Farida Fassi and Mohammed Kaci to setup the initial user support web site (OPEN) 15m
        * (6/6/05) Everything is ready. To be deployed in 2 weeks. * (20/6/2005 update) Mohammed: Guenther contacted one week ago requesting information to move the system into producition, and still waiting for the answer. The system is ready. This week will be put in operation.
        Speaker: Fassi, Farida (IFIC)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        * Fco. Bernabé reporting. * Instructions how to activate the FMON agents in the CESGA EGEE Monitoring web site.
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
        more information
      • CESGA 15m
        * J. Lopez reporting. * Maintaining existing nodes.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro Fernandez reporting. * Installing some machines with gLite 1.1. * In contact with Maite for testing.
        Speaker: Fernandez, Alvaro (IFIC)
      • LIP 15m
        * Some machines with gLite 1.1
        Speaker: David, Mario (LIP)