EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (PIC), Carlos fernandez (CESGA),Carlos Borrego (PIC), Daniel Cano (IFCA), Javier Lopez (CESGA),Gonzalo Merino (PIC), Kai Neuffer (CAB-INTA),Ricardo Graciani (UB), Javier Fontan (CESGA),Juan Saborido (USC), Manuel Delfino (PIC), Pablo Rey (CESGA),Javier Sanchez (IFIC)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * Javier Fontan reporting * A new firewall was installed and a ticket was opened by GGUS because of some blocked ports. Now solved. Site name: CESGA-EGEE Report period: 27/06/05 to 03/07/05 Opened tickets ============== [GGUS ticket#3500] We are in the process of adding firewall to our machines and beacuse os some unopened ports SE was not working for two hours or so. After opening this ports again (GLOBUS_TCP_PORT_RANGE) everything started to work again.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 24/06/05 to 01/07/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        Speaker: No contact person
      • IFCA-LCG2 15m
        * Dani Cano reporting. * Accounting restored. All FMON clients on worker nodes activated. Weekly Operations Status Report: IFCA-LCG2 Reporting Period: 27/06/2005 to 4/07/2005 Availability of Core Services Hosted in the Site RB: egeerb.ifca.org.es [OK] BDII: egeebdii.ifca.org.es [OK] PROX: egeeproxy.ifca.org.es [OK] Non-Functional Time None Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period Apel was installed but not publishing. Reconfiguration of apel, so all data available was recovered and now published. Also fmon-agent activated on all worker nodes. Upgrade to Scientific Linux 3 (or equivalent) By when will all service nodes in the site be upgraded? done By when will the WNs in the site be upgraded? done Points to Raise at the Operations Meeting None
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javi Sanchez reporting * The log disk was full and Castor failed last thursday. The problem was solved inmediately. * Migration to Scientific Linux - no date yet. -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 27/06/2005 to 04/07/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) [OK] BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time SE: Wednesday 29, around 3 hours. Castor failure. Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period None
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        * Kai Neuffer reporting. Weekly Operations Status Report: INTA-CAB Reporting Period: 27/06/05 to 01/07/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 27/06/05 to 03/07/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt (problems has to be reinstalled) RLS: se01.lip.pt LFC: se01.lip.pt Non-Functional Time ==================== [CT] 2005-07-01/03 RGMA client failure in WN (Due to RGMA schema at RAL being upgraded etc - not site specific) [OK] 7 days (We do not consider the above CT as site failure) Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC305 Points to Raise at the Operations Meeting =========================================
        Speaker: David, Mario
      • IFAE 15m
        * Carlos Borrego reporting. * New CE+MON installed. Problems installing apel.
        Speaker: Borrego, Carlos
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 27/06/05 ] to [ 03/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ce01.pic.es,bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 1 day Scheduled Down Time =================== - none Major Operational Issues Encountered During the Reporting Period ================================================================ - The test on 2005-07-01 failed. We don't really know what happened. Besides pic seemed to work perfectly well, and waht's more PIC was 100% full. - RGMA client failed on 2005-07-01 2005-07-02 and 2005-07-03. Problem solved. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 25/06/05 ] to [ 01/07/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== none UAM-LCG2 has status in http://lcg-testzone-reports.web.cern.ch/lcg-testzone-reports/cgi-bin/sitereports.cgi?site=grid003.ft.uam.es because the last check was at 2005-07-01 08:32:00 (error of R-GMA). Now UAM-LCG2 is OK in http://www2.egee.cesga.es/cgi-bin.dteam/lastreport.cgi Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [we will update when the LCG-2_5_0 is OK for Quattor.] By when will the WNs in the Site be upgraded? [we will update when the LCG-2_5_0 is OK for Quattor. ] Installation with QUATTOR (without yaim) I am using a test cluster. Now I have this machines OK : ======== 1 - CE (torque) 1 - SE (SE CLASSIC DISK) 2 - WN 1 - UI 1 - PX 1 - BDII 1 - RB 1 - POOL (dcache) 1 - SE Dcache we will update when the LCG-2_5_0 is OK for Quattor. Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting. Reporting Period: 27/06/2005 to 03/07/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Points to Raise at the Operations Meeting ========================================= None
        Speaker: Graciani, Ricardo
      • UPV-GRyCAP 15m
        * Reported by mail. Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 27/06/05 ] to [ 01/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        * Juan Saborido reporting. Reporting Period: 24/06/2005 to 01/07/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From Jun 25 to July 1 == Summary == June 27, 28 and 30 R-GMA Server has been down. This avoids publishing accounting data during these days even if Apel is working fine in some sites. By other hand, during this week IFCA has resumed to publish their accouting data. So now there are 12 (of 13) sites publishing accounting data every day. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Since 30/06/05 they are not publishing this information Actions: Solve the problems with the user name information Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 23/06/05 Publishing User Name Information: NO. The last published data has not this informatation Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: They are in maintenance. Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have some problems with their machines so they had not publish data of jobs corresponding to 28 Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have some problems with their machines so they had not publish data of jobs corresponding to 26, 27 and 28 Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        * Fco. Bernabé reporting. * Instructions how to activate the FMON agents in the CESGA EGEE Monitoring web site.
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
        more information
      • CESGA 15m
        * Javier Lopez reporting. * Upgrading the testing testbed installed at CERN.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Starting installation of gLite. * Alvaro is at CERN for the test task assignation.
        Speaker: Fernandez, Alvaro (IFIC)
      • LIP 15m
        * Some core gLite services running.
        Speaker: David, Mario (LIP)
      • INTA 15m
        * Kai Neuffer reporting. * Started installation of gLite site.
        Speaker: Neuffer, Kai (CAB-INTA)