EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (PIC), Gonzalo Merino (PIC), Dani Cano (IFCA), Pepe Salt (IFIC), Adria Casajus (UB), Celso Martinez (IFCA), Javier Sanchez (IFIC), Javier Lopez (CESGA), Javier Fontan (CESGA), Guillermo Losilla (BIFI), Pablo Rey (CESGA), Rafa Marco (IFCA), Manuel Delfino (PIC), Alvaro Fernandez (IFIC), Carlos Fernandez (CESGA), Marc Rodriguez (PIC).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: http://services2.pic.org.es/devel/download/txt/SR-template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * Javier Lopez reporting. Site name: CESGA-EGEE Report period: 04/07/05 to 10/07/05 Operational Issues ================== No major problems this week.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 02/07/05 to 08/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ SFT reports failed status on 2005-07-06 due to RGMA-client tests. After restart tomcat daemon on RGMA server test was passed sucesfully. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * No report. * All checks are OK.
        Speaker: No contact person
      • IFCA-LCG2 15m
        * Dani Cano reporting. * BIOMED Data Challenge started. All ok.
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javier Sanchez reporting. * All OK. -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 04/07/2005 to 11/07/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) [OK] BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time None Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period None
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 04/07/05 to 10/07/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt (problems has to be reinstalled) RLS: se01.lip.pt LFC: se01.lip.pt Non-Functional Time ==================== [CT] 2005-07-05 RGMA client failure in WN (problems contacting RGMA schema/registry at RAL + 3rd party rep central SE to local SE) a later test in that same day was OK) [OK] 7 days Points to Raise at the Operations Meeting ========================================= Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC305 Points to Raise at the Operations Meeting =========================================
        Speaker: David, Mario
      • IFAE 15m
        * Gonzalo Merino reporting. * IFAE reinstalled with a minimal setup using PIC as StorageElement.
        Speaker: Borrego, Carlos
      • PIC 15m
        * Gonzalo Merino reporting. * All ok but at the week-end Castor was stopped due to a hardware failure of the ACSLS Server.
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 2/07/05 ] to [ 08/07/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== none Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor.] By when will the WNs in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor. ] Installation with QUATTOR (without yaim) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting. * All OK. Weekly Operations Status Report: UB Reporting Period: 04/07/2005 to 10/07/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Points to Raise at the Operations Meeting ========================================= None
        Speaker: Graciani, Ricardo and Casajus, Adrian
      • UPV-GRyCAP 15m
        * Reported by mail. * They have been problems last July 6-7th with R-GMA Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 04/07/05 ] to [ 08/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> [OK] Non-Functional Time ==================== - Total days unavailable: 2 days 06/07/05 - 07/07/05 -> RGMA Problem (problem in MON BOX) Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        * Reported by mail. * Site Ok all week. Weekly Operations Status Report: USC Reporting Period: 01/07/2005 to 08/07/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
        * Guillermo Losilla reporting. * The last problems are solved. The site will be certified today and added to the GOC DB.
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From July 2 to July 8 == Summary == There is nothing special to comment about accounting this week. == Status of each SWE site == Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: NO Missing Accounting Entries: None Publishing User Name Information: Since 30/06/05 they are not publishing this information Actions: Solve the problems with the user name information Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 23/06/05 Publishing User Name Information: NO. The last published data has not this informatation Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: They are in maintenance. Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: NO. The last day they have published data from 26/06/05 to 08/07/05 without this information Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have some problems with their machines so they had not publish data of jobs corresponding to 26, 27 and 28 Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.8 CNB to upgrade Apel version 3.4.39-1 (PENDING) 15m
        Speaker: Lopez Cacheiro, Javier (CESGA)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
      • 5.5.30.1 CNB, UB, UAM, IFCA, IFIC, PIC, USC to activate fmon agents in the WNs 15m
        * Fco. Bernabé reporting. * Instructions how to activate the FMON agents in the CESGA EGEE Monitoring web site.
        Speaker: Fco. Jose Bernabe (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        * Last friday there was a problem with the R-GMA server.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro Fernandez reporting. * CE, UI and WN working. * Trying to configure the IO server to access the Castor service at IFIC.
        Speaker: Fernandez, Alvaro (IFIC)
      • LIP 15m
        * Mario had problems joining.
        Speaker: David, Mario (LIP)
      • INTA 15m
        * No report.
        Speaker: Neuffer, Kai (CAB-INTA)